Laserfiche WebLink
Description <br />Percentage <br />Cost <br />Liability and Insurance <br />2.02 <br />$ 6.46 <br />Performance Bond <br />0.00 <br />$ 0.00 <br />Profit <br />10.00 <br />$ 32.00 <br />Financial warranty processing <br />(legal /related costs) <br />0.00 <br />$ 0.00 <br />Engineering work and/or contract bid/preparation <br />0.00 <br />$ 0.00 <br />Reclamation management and/or administration <br />5.00 <br />$ 16.00 <br />Description <br />Number of Items <br />Cost per Unit <br />Cost <br />Proposed Sump Pumps <br />2 <br />$80 <br />$160.00 <br />Installation Cost <br />N/A <br />N/A <br />$160.00 <br />Total <br />$320.00 <br />Proposed Technical Revision <br />Direct Costs <br />Indirect Costs <br />Cotter Corporation (N.S.L.) <br />Temporary Sump Pump Installation <br />8/14/12 <br />Background and Rationale <br />Ralston Creek, adjacent to the Schwartzwalder Mine site, is currently dry. Cotter Corporation <br />(N.S.L.) ( "Cotter ") has identified two locations in the dry creek bed with low subsurface flow <br />that contain uranium which can be collected and treated. Cotter desires to collect and treat this <br />water before it leaves Cotter's property. <br />Cotter would like to install two (2) temporary low -flow sump pumps in shallow sumps (one <br />pump per sump) in the creek bed of Ralston Creek to collect this subsurface flow and process it <br />through the water treatment facility at the Schwartzwalder Mine site. The sole objective of this <br />effort is to protect the Ralston Creek water quality. Pumping would be performed using the <br />aforementioned low -flow pumps, which Cotter currently has on hand, to collect the subsurface <br />flow from the creek and pump it into existing Sumps 5 and 8, using currently installed <br />mechanical and electrical infrastructure. The water would then be treated at the water treatment <br />facility for discharge under Water Quality Control Division permit CO- 0001244. See Figure 1 <br />below for picture of proposed low -flow sump pumps. <br />Bonding <br />The cost for the parts and installation of the two low -flow sump pumps in the creek bed is <br />estimated to be approximately $320.00. This cost is the proposed basis for TR -21 bonding, as <br />detailed below. <br />