a
<br />n
<br />z
<br />n
<br />ENGINEER'S NOTES:
<br />1. PROJECT CONTROL /BENCHMARK: BENCHMARK: 3 1/2" BRASS CAP IN
<br />CONCRETE STAMPED "P 329 1951" AT NORTHEAST CORNER OF HIGHWAY 66
<br />AND WELD COUNTY ROAD 11, 34 FEET NORTH OF CENTERLINE OF HIGHWAY
<br />66 AND 3 FEET EAST OF POWER POLE, ELEVATION = 4953.57 NAVD88.
<br />ALL ELEVATIONS SHOWN ON THESE PLANS ARE REFERENCED TO THE
<br />PROJECT BENCHMARK. HORIZONTAL CONTROL, INCLUDING THE BASIS OF
<br />BEARING, SHALL BE IN ACCORDANCE WITH THE FINAL SUBDIVISION PLAT
<br />FOR THIS PROJECT.
<br />2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SAFEGUARDING THE
<br />PROJECT BENCHMARK AND OTHER SURVEY MONUMENTS AND SHALL HAVE
<br />A REGISTERED LAND SURVEYOR TIE OUT AND RESET ANY PROPERTY
<br />CORNERS OR SECTION CORNERS PLANNED TO BE DISTURBED BY
<br />CONSTRUCTION OF THIS PROJECT. THE CONTRACTOR SHALL ALSO BE
<br />RESPONSIBLE FOR ANY INADVERTENTLY DISTURBED OR DAMAGED
<br />MONUMENTS AND SHALL HAVE THEM REESTABLISHED AND REPLACED BY A
<br />REGISTERED LAND SURVEYOR.
<br />3. THE CONTRACTOR SHALL COMPLY, AND PERFORM WORK IN ACCORDANCE,
<br />WITH THE REQUIREMENTS OF THE GEOTECHNICAL (SOILS) REPORT
<br />PREPARED FOR THIS PROJECT. GEOTECHNICAL INFORMATION FOR THIS
<br />PROJECT IS BASED ON THE REPORT
<br />4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING THE SERVICES
<br />OF A QUALIFIED TESTING LABORATORY TO PERFORM ALL COMPACTION
<br />TESTING, ASPHALT TESTING, CONCRETE TESTING, AND ANY OTHER
<br />TESTING AS MAY BE REQUIRED TO COMPLETE THE WORK. TESTING
<br />RESULTS MUST BE SUBMITTED FOR ALL PHASES OF THIS PROJECT PER THE
<br />APPLICABLE GOVERNING AGENCIES REQUIREMENTS.
<br />5. THE CONTRACTOR SHALL MAINTAIN AT LEAST ONE (1) SET OF "REDLINED"
<br />PRINTS OF THE CONSTRUCTION PLANS. THE "REDLINED" PRINTS SHALL BE
<br />KEPT CURRENT TO ACCURATELY REPRESENT THE DIMENSIONS AND
<br />LOCATIONS OF ALL WORK PERFORMED BY THE CONTRACTOR. THE
<br />CONTRACTOR MUST PRESENT THE "REDLINED" PRINTS TO THE ENGINEER
<br />( REDLAND) TIMELY UPON COMPLETION OF EACH PHASE OF THE WORK.
<br />6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROMPTLY NOTIFYING THE
<br />ENGINEER OF ANY PROBLEMS OR POTENTIAL PROBLEMS IN CONFORMING
<br />TO THE DESIGN LINE AND GRADE FOR ANY ELEMENT OF THE
<br />CONSTRUCTION. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL BE
<br />RESPONSIBLE FOR PROMPTLY NOTIFYING THE ENGINEER OF SITE
<br />CONDITIONS THAT DIFFER FROM THOSE SHOWN ON THE APPROVED PLANS.
<br />7. IN THE EVENT THE CONTRACTOR ALLOWS, AUTHORIZES, APPROVES OR
<br />CONSTRUCTS ITEMS THAT DIFFER FROM THE APPROVED PLANS,
<br />SPECIFICATIONS OR OTHER CONTRACT DOCUMENTS, WITHOUT WRITTEN
<br />APPROVAL BY THE ENGINEER, THE CONTRACTOR SHALL BE RESPONSIBLE
<br />FOR ANY LIABILITY ARISING FROM SUCH CHANGES.
<br />8. THE CONTRACTOR SHALL PERFORM ALL WORK ACCORDING TO ALL
<br />COUNTY, STATE AND FEDERAL SAFETY AND HEALTH REGULATIONS. IN
<br />PARTICULAR, THE TRENCHING AND OPEN EXCAVATION OPERATIONS SHALL
<br />COMPLY WITH ALL CURRENT O.S.H.A. REGULATORY REQUIREMENTS.
<br />9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING SAFEGUARDS,
<br />SAFETY DEVICES, PROTECTIVE EQUIPMENT, AND ANY OTHER NEEDED
<br />ACTION TO PROTECT THE LIFE, HEALTH AND SAFETY OF THE PUBLIC AND
<br />TO PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF
<br />WORK COVERED BY THE CONTRACTOR.
<br />I/
<br />RECLAMATION
<br />PERMIT BOUNDARY
<br />i
<br />b (TYP)� ® .i
<br />r
<br />I
<br />10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE JOB SITE CONDITIONS
<br />THROUGHOUT THE DURATION OF CONSTRUCTION INCLUDING SAFETY OF
<br />ALL PERSONS AND PROTECTION OF PROPERTY. THIS REQUIREMENT SHALL
<br />APPLY CONTINUOUSLY AND NOT BE LIMITED ONLY TO WORKING HOURS.
<br />THE CONTRACTOR SHALL DEFEND INDEMNIFY AND HOLD THE OWNER, THE
<br />ENGINEER AND THE GOVERNING JURISDICTION HARMLESS FOR ANY AND
<br />ALL LIABILITY, IN CONNECTION WITH THE PERFORMANCE OF WORK, EXCEPT
<br />FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER, THE
<br />ENGINEER OR THE GOVERNING JURISDICTION.
<br />11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING SAFE,
<br />PASSABLE ACCESS TO PRIVATE PROPERTIES ADJACENT TO THE WORK
<br />THROUGHOUT THE PERIOD OF CONSTRUCTION.
<br />12. THE TYPE, SIZE, LOCATION, AND NUMBER OF UNDERGROUND UTILITIES ARE
<br />APPROXIMATE WHERE SHOWN ON THE PLANS AND WERE TAKEN FROM
<br />RECORDS OF THE CONTROLLING AGENCIES AND /OR FROM MARKINGS IN
<br />THE FIELD BY AN AGENCY AND /OR UTILITY LOCATING CONTRACTOR. THE
<br />ENGINEER ASSUMES NO RESPONSIBILITY FOR THEIR COMPLETENESS OR
<br />ACCURACY. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO
<br />VERIFY THE EXISTENCE AND LOCATION OF ALL UNDERGROUND UTILITIES
<br />ALONG THE ROUTE OF THE WORK AND PARTICIPATE IN THE RESOLUTION
<br />OF ANY CONFLICTS PRIOR TO THE COMMENCEMENT OF CONSTRUCTION.
<br />13. THE CONTRACTOR SHALL CONTACT THE UTILITY NOTIFICATION CENTER OF
<br />COLORADO FOR THE LOCATION OF UNDERGROUND GAS, ELECTRIC AND
<br />COMMUNICATION UTILITIES AT LEAST 48 HOURS PRIOR TO CONSTRUCTION
<br />(CALL 811 OR 1-800-922-1987). THE CONTRACTOR SHALL ALSO NOTIFY ANY
<br />OTHER APPLICABLE UTILITY COMPANIES TO OBTAIN FIELD LOCATES OF ALL
<br />EXISTING UTILITIES PRIOR TO CONSTRUCTION.
<br />14. THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES TO
<br />COORDINATE SCHEDULES PRIOR TO THE COMMENCEMENT OF
<br />CONSTRUCTION AND SHALL BE RESPONSIBLE FOR COORDINATION OF ALL
<br />NECESSARY UTILITY RELOCATIONS WITH THE APPROPRIATE UTILITY
<br />COMPANY.
<br />15. TEMPORARY EROSION CONTROL MEASURES SHALL BE PROVIDED BY THE
<br />CONTRACTOR DURING CONSTRUCTION AS IDENTIFIED IN THE EROSION
<br />CONTROL AND /OR STORMWATER MANAGEMENT PLANS. MAINTENANCE OF
<br />ONSITE DRAINAGE AND EROSION CONTROL FACILITIES DURING
<br />CONSTRUCTION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. THE
<br />REMOVAL OF TEMPORARY EROSION CONTROL MEASURES SHALL BE THE
<br />RESPONSIBILITY OF THE CONTRACTOR. HOWEVER, REMOVALS SHALL NOT
<br />OCCUR UNTIL THE GOVERNING JURISDICTION HAS GIVEN APPROVAL TO
<br />REMOVE ANY OF THE MEASURES.
<br />16. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANING NEARBY PUBLIC
<br />OR PRIVATE STREETS OF MUD AND DEBRIS, DUE TO CONSTRUCTION
<br />ACTIVITIES, ON A DAILY BASIS OR AS DIRECTED BY GOVERNING
<br />JURISDICTION PERSONNEL.
<br />17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR AND /OR
<br />REPLACEMENT OF ANY DAMAGED EXISTING IMPROVEMENTS INCLUDING,
<br />BUT NOT LIMITED TO, PAVEMENT, CURB AND GUTTER, SIDEWALK,
<br />LANDSCAPING, IRRIGATION, SIGNAGE, STRIPING, AND UTILITIES.
<br />18. ALL CONSTRUCTION ACTIVITIES MUST COMPLY WITH THE STATE OF
<br />COLORADO PERMITTING PROCESS FOR " STORMWATER DISCHARGES
<br />ASSOCIATED WITH CONSTRUCTION ACTIVITY." FOR INFORMATION,
<br />CONTACT THE COLORADO DEPARTMENT OF HEALTH, WATER QUALITY
<br />CONTROL DIVISION, WQCD- PE -B2, 4300 CHERRY DRIVE SOUTH, DENVER,
<br />COLORADO, 80246 -1530, ATTENTION: PERMITS AND ENFORCEMENT
<br />SECTION. PHONE (303) 692 -3590.
<br />19. IF DEWATERING IS TO BE USED TO INSTALL UTILITIES OR CONSTRUCT
<br />IMPROVEMENTS, A STATE CONSTRUCTION DEWATERING DISCHARGE
<br />PERMIT IS REQUIRED IF DISCHARGE IS INTO A STORM SEWER, CHANNEL,
<br />IRRIGATION DITCH, OR ANY WATERS OF THE UNITED STATES.
<br />20.THE CONTRACTOR SHALL HAVE IN HIS POSSESSION AT ALL TIMES THE
<br />APPROPRIATE EDITION OF THE GOVERNING JURISDICTION DESIGN AND
<br />CONSTRUCTION STANDARDS, ONE SET OF APPROVED CONSTRUCTION
<br />PLANS, THE STORMWATER MANAGEMENT PLAN, AND ALL REQUIRED
<br />PERMITS.
<br />21.ALL STREET, SANITARY SEWER, STORM SEWER AND WATERLINE
<br />CONSTRUCTION SHALL CONFORM TO THE STANDARDS AND
<br />SPECIFICATIONS OF THE APPLICABLE GOVERNING LOCAL AGENCY
<br />CURRENT AT THE DATE OF CONSTRUCTION PLAN APPROVAL. FOR
<br />ELEMENTS OF WORK NOT COVERED BY LOCAL AGENCY STANDARDS AND
<br />SPECIFICATIONS, ALL CONSTRUCTION SHALL CONFORM TO THE
<br />APPROPRIATE EDITION OF THE STANDARDS AND SPECIFICATIONS OF THE
<br />COLORADO DEPARTMENT OF TRANSPORTATION, THE URBAN DRAINAGE
<br />AND FLOOD CONTROL DISTRICT, AND INDUSTRY STANDARDS AS
<br />APPLICABLE. REQUIREMENTS OF THE COLORADO DEPARTMENT OF PUBLIC
<br />HEALTH AND ENVIRONMENT, THE ENVIRONMENTAL PROTECTION AGENCY
<br />AND THE U.S. ARMY CORPS OF ENGINEERS, SHALL ALSO BE FOLLOWED AS
<br />THEY RELATE TO THE WORK.
<br />22.THE CONTRACTOR SHALL PROVIDE AND IMPLEMENT "TRAFFIC CONTROL
<br />PLAN" RELATED TO ALL CONSTRUCTION ACTIVITIES FOR THIS PROJECT. ALL
<br />TRAFFIC CONTROL DEVICES, STRIPING, AND SIGNING SHALL BE IN
<br />ACCORDANCE WITH THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES
<br />(MUTCD).
<br />23.ALL STATIONING IS ON CENTERLINE UNLESS OTHERWISE NOTED.
<br />CENTERLINE, RIGHTS -OF -WAY (R.O.W.), PROPERTY LINE, AND EASEMENT
<br />DIMENSIONS ARE FOR REFERENCE ONLY. REFER TO THE FINAL
<br />SUBDIVISION PLAT FOR PROJECT HORIZONTAL CONTROL,
<br />24.REFER TO LANDSCAPING PLANS FOR SEEDING, PLANTING AND
<br />STABILIZATION REQUIREMENTS,
<br />0
<br />RECLAMATION
<br />Tyco PERMIT BOUNDARY
<br />�p /fir
<br />(TYP)
<br />w
<br />P
<br />C302✓ _r
<br />C3.0 \.
<br />,
<br />N
<br />N
<br />W E
<br />U
<br />u U
<br />Z�
<br />oc
<br />� C) •o
<br />I n J
<br />O O
<br />N -
<br />L m
<br />N 00
<br />N �
<br />T
<br />^ u
<br />(y)
<br />�l O C N co
<br />LL! ° O
<br />W J�
<br />0 -=
<br />o O
<br />O
<br />O
<br />REeelven
<br />Al IP, 102012
<br />U(v;s(on of REclamation,
<br />Mining E Safety
<br />EXISTING GRADE
<br />\
<br />a
<br />u'
<br />a
<br />AREA TO BE GRADED TO EL: 4818.0
<br />6.0
<br />DISTANCE
<br />°
<br />o
<br />\
<br />DISTANCE VARIES
<br />VARIES
<br />>
<br />Q a
<br />REF TO PLANS FOR GRADING LIMITS
<br />o w
<br />v
<br />0 u
<br />\
<br />\
<br />4818.0
<br />x
<br />U
<br />a
<br />a
<br />Q
<br />a
<br />rj
<br />o
<br />PROPOSED GRADING
<br />LEVEL
<br />4818.0 \
<br />4816.5
<br />±1
<br />1 �
<br />4
<br />\ 1 3 MATCH EXISTING
<br />\ (M.E.)
<br />WETLAND BENCH GRADING
<br />N
<br />w
<br />o
<br />Z
<br />TYPICAL CROSS SECTION
<br />_ `"
<br />r
<br />C3 -
<br />r
<br />II
<br />/ 4 w
<br />,,....._.._ '."ter >.. ._.... ..�
<br />i 1
<br />\
<br />ji
<br />> r�:'�, ,��'^ ,,_..A i � :lr/ /! I'! 7, Lr n�rr .� ✓r _,;: r ir��� \ /,. _ v_:.. � yZvG 3
<br />a %' %, (�i� s, % f ,':. :- r: '�Ar� -. / ..• / ,__ A ! i r/; `,. li f ! /// � �� ._.'. �/ � ��./ ,, ;�/ / f i I t -. ,, ,�;�_,:i r �, t / -, ,. - _. ... / zv _
<br />'C3 / ::Ilii It I'I �;II/ ,7 i lr'V :, r % �„(\ !/ l,,f / /j/ ,;! ;.(': lii..;rr +-._• J /// r r _ / / A ___. ■
<br />/ I
<br />� I
<br />zf!,I p..,, „x
<br />.
<br />r ;,,- ,,,i /w „ r! /,t� /' %l /`q )I�,.. : /(r _ �i1 �7*r..,�.c.:.`.A �, /',rVA;�� �' /.•r r'> ," L._ _ i,d. ";�,
<br />6
<br />' '� 1 /GI�aN✓�yf ! / I %'; '. i� - �'� ;.� i .1 ;,y <, � 'l, /r ! / �- :�,1n9;. ,/ •- ,,. :Ail _r /r _:`>�, .� .._" r, ��,. �: �/ / v... �v t. }tti;}.. �V' ,.
<br />r -
<br />`; /.
<br />�/ �',! \� "...._ 'i 1•: �`t \li��.` ,:. _...1,. ^,.\ � � _ ^, ( .. /. r,�� � \mil' ,
<br />c 3 ■ 5,
<br />�v
<br />C3.3
<br />P,3'_.1y\\
<br />�
<br />r
<br />� -,
<br />J
<br />RECLAMATION
<br />- - PERMIT BOUNDARY /
<br />(TYP)
<br />I
<br />I\
<br />' \ 1
<br />\\ �\
<br />i °4 1
<br />h I
<br />Sc.
<br />/
<br />RECLAMATION
<br />PERMIT BOUNDARY
<br />(TYP)
<br />OVERALL SITE
<br />SCALE: I"= 300'
<br />1
<br />J
<br />Q
<br />F_
<br />m
<br />J
<br />Q
<br />Z
<br />O
<br />Z
<br />wo
<br />a
<br />o �
<br />T_
<br />O
<br />Z
<br />U) (D
<br />W
<br />Y z
<br />JJ_
<br />LL
<br />OW
<br />O�ul
<br />�W�/
<br />LJ_ Z
<br />W Q
<br />of
<br />WI
<br />U)
<br />SHEET
<br />v/
<br />W
<br />Fm
<br />0
<br />Z
<br />J
<br />W
<br />W
<br />V
<br />C2.0
<br />
|