My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-08-08_HYDROLOGY - M1984043
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1984043
>
2012-08-08_HYDROLOGY - M1984043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:04:50 PM
Creation date
8/13/2012 3:42:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984043
IBM Index Class Name
HYDROLOGY
Doc Date
8/8/2012
Doc Name
SUBSTITUTE WATER SUPPLY PLAN
From
DWR
To
PELINO EXCAVATION
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jesse Lee SWSP Pit Page 4 <br />August 8, 2012 <br />depletions that result from mining related exposure of ground water. <br />In accordance with approach nos. 1 and 3, you have indicated that a bond has <br />been obtained for $32,000 through the Division of Reclamation, Mining, and Safety <br />( "DRMS ") to assure that depletions from groundwater evaporation do not occur in <br />the unforeseen event, or events, that would lead to the abandonment of the Pit. <br />12. This substitute water supply plan may be revoked or modified at any time should it <br />be determined that injury to other vested water rights has or will occur as a result of <br />this plan. Should this substitute water supply plan expire without renewal or be <br />revoked prior to adjudication of a permanent plan for augmentation, all excavation <br />of product from below the water table, and all other use of water at the pit, must <br />cease immediately. <br />13. In accordance with amendments to §25 -8- 202(7), C.R.S., and Senate Bill 89 -181 <br />Rules and Regulations adopted on February 4, 1992, the State Engineer shall <br />determine if the substitute supply is of a quality to meet requirements of use to <br />which the senior appropriation receiving the substituted supply has normally been <br />put. As such, water quality data or analyses may be requested at any time to <br />determine if the requirements of use of the senior appropriator are met. <br />14. The decision of the State Engineer shall have no precedential or evidentiary force, <br />shall not create any presumptions, shift the burden of proof, or serve as defense in <br />any water court case or any other legal action that may be initiated concerning the <br />substitute water supply plan. This decision shall not bind the State Engineer to act <br />in a similar manner in any other applications involving other plans or in any <br />proposed renewal of this plan, and shall not imply concurrence with any findings of <br />fact or conclusions of law contained herein, or with the engineering methodologies <br />used by this applicant. Any appeal of a decision made by the State Engineer <br />concerning a SWSP pursuant to C.R.S. §37 - -90- 137(11) shall be to the Division 2 <br />water judge within thirty days of the date of this decision and shall be consolidated <br />with the application for approval of the plan for augmentation. <br />Please contact loana Comaniciu in Denver at (303) 866 -3581, or Julie Pearson in <br />Pueblo at (719) 542 -3368, if you have any questions concerning this approval. <br />Enclosure: Table 3 <br />Sincerely, <br />Heidi Frey, .E. <br />Water Resource Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.