Laserfiche WebLink
ATTACHMENT A <br />2012 CQA FIELD STAFF SCHEDULE FOR AMEC PERSONNEL <br />Phase 5 Berm Raise <br />Name <br />JUN 17 <br />JUN 18 <br />JUN 19 <br />JUN 20 <br />JUN 21 <br />JUN 22 <br />JUN 23 <br />Joseph Hickey <br />- <br />PR <br />PR <br />PR <br />PR <br />PR <br />- <br />Bill Erickson <br />- <br />ST <br />ST <br />ST <br />ST <br />ST <br />- <br />Jay Moore <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />Ron Arlian <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />*Night Shift <br />LEGEND <br />PS = <br />Project Sponsor <br />PCE <br />= Project Certifying Engineer <br />PM = <br />Project Manager <br />PR = <br />Project Resident <br />LS = <br />Lead Soils Engineer <br />LG = <br />Lead Geosynthetics Engineer <br />ST = <br />Soil Technician <br />LT = <br />Laboratory Technician <br />GT = <br />Geosynthetics Technician <br />FLM= <br />Field /Laboratory Manager <br />SE = <br />Senior Engineer <br />PSBR.Weekly Report WE 06.23.2012 <br />