Laserfiche WebLink
Mr. Patrick C. Siglin <br />August 8, 2012 <br />Page 2 <br />are planned as part of this modification and note that any additional holes (up to a total of 50) will <br />require Black Range to submit additional financial warranty. <br />4) Development Water — Please provide some discussion on the amount of development water expected <br />from each monitoring well and how that water will be handled and/or disposed. <br />Be advised that if these items have not been addressed within 60 days of the date of this letter (i.e., October 8, <br />2012), the Division may terminate the NOI modification application in accordance with Rule 5.1.3(c) of the <br />Hard Rock Rules. <br />Please remember to designate as appropriate those materials in the application that you desire to be made <br />confidential versus those to be made public. Additionally, if you have received any pertinent correspondence <br />from the Bureau of Land Management, please forward copies to the Division. <br />The Division forwarded two comments received via email to Black Range; one from Mr. Lee J. Alter and the <br />other from Ms. Kay Hawklee. If you did not receive one or both of these emails from the Division, please let <br />me know. <br />If you have any questions, please contact me at (303)866 -3567 x8169. <br />Sincerely, <br />Timo • A. Cazier, P.E. <br />Environmental Protection Specialist <br />cc: Tom Kaldenbach, DRMS <br />