Laserfiche WebLink
ATTACHMENT A <br />2012 CQA FIELD STAFF SCHEDULE FOR AMEC PERSONNEL <br />Phase 5 Berm Raise <br />Name <br />JUN 17 <br />JUN 18 <br />JUN 19 <br />JUN 20 <br />JUN 21 <br />JUN 22 <br />JUN 23 <br />Joseph Hickey <br />- <br />PR <br />PR <br />PR <br />PR <br />PR <br />- <br />Bill Erickson <br />- <br />ST <br />ST <br />ST <br />ST <br />ST <br />- <br />Jay Moore <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />Ron Arlian <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />*Night Shift <br />LEGEND <br />PS = Project Sponsor <br />PCE = Project Certifying Engineer <br />PM = Project Manager <br />PR = Project Resident <br />LS = Lead Soils Engineer <br />LG = Lead Geosynthetics Engineer <br />ST = Soil Technician <br />LT = Laboratory Technician <br />GT = Geosynthetics Technician <br />FLM= Field /Laboratory Manager <br />SE = Senior Engineer <br />PSBR.Weekly Report WE 06.23.2012 <br />