My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-01-25_HYDROLOGY - M1977378 (3)
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977378
>
1999-01-25_HYDROLOGY - M1977378 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2021 12:32:19 PM
Creation date
8/10/2012 10:59:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
HYDROLOGY
Doc Date
1/25/1999
Doc Name
4th Quarter 1998 Report
From
Sunnyside Gold Corp.
To
EPA
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
999 <br /> RECEIVEC <br /> St1i1 KYSIDE GOLD <br /> AN EC330 8"COMPANY <br /> P.O. Box 177 • suverton, CO 81433 <br /> Phone (970) 387-5533 • Fax (970) 387-5310 4 <br /> January 20, 1999 <br /> 5 yeYd Office <br /> wnerd-15&G90100 <br /> Attention: Ron Zdyb <br /> Mail Code: 8D2-W-GW <br /> U.S. Environmental Protection Agency fo <br /> Underground Injection Control (UIC) <br /> 999 18th Street, Suite 500 <br /> Denver, CO 80202-2466 <br /> RE: EPA File No. C05000-03745, San Juan County, Colorado <br /> 4th Quarter 1998 Report (October- December) <br /> Dear Mr. Zdyb: <br /> In accordance with the quarterly reporting requirements of EPA's June 26, 1996 Rule <br /> Authorization letter for injection of water and alkaline material into the Sunnyside Mine, <br /> Sunnyside Gold Corporation (SGC) submits the following report. This report covers the period <br /> from October 1, 1998, through December 31,1998. <br /> Terry Tunnel Bulkhead <br /> The Terry Tunnel bulkhead was inaccessible during the 4th quarter and no inspections or <br /> sampling occurred. The mine pool elevation remained below 11,600' elevation based on pressure <br /> monitoring at the lower American Tunnel bulkhead. Therefore, the bulkhead pressure should be <br /> 8psi. <br />
The URL can be used to link to this page
Your browser does not support the video tag.