My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-07-23_HYDROLOGY - M1977378
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977378
>
1999-07-23_HYDROLOGY - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2021 11:49:18 AM
Creation date
8/10/2012 10:58:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
HYDROLOGY
Doc Date
7/23/1999
Doc Name
2nd Quarter 1999 Report
From
Sunnyside Gold Corp.
To
EPA
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
999 <br /> 1� <br /> SUNNYSIDE GOLD CORPORATION <br /> AN ECHO 8AY COMPANY <br /> P EN VE� OFFIc <br /> P.O. Box 177 • Silverton, CO 81433 QL� <br /> Phone (970) 387-5533 Fax (970) 387-5310 C 'FILE Copy <br /> 8 <br /> •�l,s7f) S /i/9� <br /> co,-t <br /> Attn: Ron Zdyb <br /> Mail s- <br /> Code: 8D2-W-GW <br /> U. S. Environmental Protection Agency <br /> Underground Injection Control (UIC)999 181" St., Suite 500 Received <br /> Denver, CO 80202-2466 <br /> RE: EPA File No. C0500-03745, San Juan County, Colorado <br /> Ems11°' 2nd Quarter 1999 Report (April —June) <br /> f�q�can�;r F;P�d O�f We <br /> Dear Mr. Zdyb: <br /> Division ei a Geology <br /> In accordance with the quarterly reporting requirements of EPA's June 26, 1996 Rule <br /> Authorization letter for injection of water and alkaline material into the Sunnyside Mine, <br /> Sunnyside Gold Corporation (SGC) submits the following report. This report covers the <br /> period from April 1, 1999 through June 30, 1999. <br /> Terry Tunnel Bulkhead <br /> The Terry Tunnel bulkhead was inspected on June 28, 1999. During this inspection, a <br /> pressure gage was installed since the mine pool is now at this level. The pressure was <br /> 11.5 psi. In the 3`d quarter this gage and the American Tunnel gage will be checked <br /> against each other by reading them on the same day. A sample was also taken from the <br /> pool behind the bulkhead. Analytical results have not been received and will be reported <br /> with the 3`d quarter report. Field parameters were: temperature 8.4° C; conductivity <br /> 2000 umho; and pH 6.99. <br /> Inspection of the bulkhead and immediate tunnel area did not reveal any reason for <br /> concern or give any indication that the bulkhead is not performing as designed. The <br /> bulkhead valve was opened to accept pump back from the Terry Tunnel settling ponds to <br /> eliminate any potential for pond discharge. <br />
The URL can be used to link to this page
Your browser does not support the video tag.