Laserfiche WebLink
Data Sheet - Sunnyaide Pit <br />Total tons estimated - 1,659,000 <br />Total tons ore - 271,750 <br />Total tons waste - 1,3'7,250 <br />Highest working elevation - 12,70 ft. <br />Preliminary pit bottom - 12,200 ft. <br />Haulage : <br />Waste - longest estimated haul one way 2,000 ft. <br />Ore - Longest haul if ore pass is used 2,5 ft. <br />If ore is trucked off mountain. <br />A.) Pit site to Eureka <br />6.) Eureka to Mayflower Mill, <br />C.) Pit site to Mayflower Mill <br />5 - miles <br />5.; - miles <br />101 -miles <br />AVE. P//000 TPD To Go ,iPi6TE PST /N ONE S <br />