Laserfiche WebLink
999 sh - 1 of 4 <br /> Colorado Division of Minerals and Geology <br /> ---RECLAMATION-COST-SUMMARY FORM----- <br /> DIENVER OFFICE <br /> PERMIT NUMBER : M-77 378 PREP. BY: WHE FILENAME: M378-0 PUBLIC FILE COPY <br /> -------- -------- ------------ FILE:- ej- 7 7-s <br /> DATE : 04-Feb-98 OPERATION: Sunnyside Mine <br /> -------------------------------- SITE: s 1 S/14 <br /> PERMIT ACTION : SL-01 RecaL <br /> ----------------------------------------------------- <br /> GRAND TOTAL BOND AMOUNT $1,209,653 <br /> I. DIRECT COSTS <br /> ------------------------------------------------------------------------ <br /> ------------------------------------------------------------------------ <br /> A. EARTHWORK - BACKFILLING & ROUGH GRADING <br /> Task No.I Task Description I Cost ($) <br /> -------- ------------------------------------------------- RECEIVED <br /> 1 I BackfiLL subsidence feature at Lake Emma I $48,540 <br /> 4 I Rough grade & rip 6 acres at Lake Emma I $8,261 F E B 09 1998 <br /> I I <br /> 7 I Rough grade & rip 5 acres at Terry Tunnel I $9,309 Division of Minerals&Geology <br /> I I <br /> 10 I Rough grade & rip 8 acres at American Tunnet I $16,521 <br /> I I <br /> 11 I BackfitL Cement Creek diversion cut I $424 <br /> I I <br /> 15 I Rough grade & rip Mayflower Borrow areas I $9,112 <br /> I for Pond 4 & Pond 3 I <br /> I I <br /> I I <br /> I I <br /> I I <br /> I I <br /> I I <br /> I I <br /> I I <br /> ------------------------------------------------------------------------ <br /> Subtotal (A): $92,166 <br /> B. EARTHWORK - HIGHWALL REDUCTION <br /> Task Nod Task Description I Cost ($) <br /> --------------------------------------------------I------------ <br /> I I <br /> NA I I <br /> I I <br /> I I <br /> I I <br /> ------------------------------------------------------------------------- <br /> Subtotal (B): <br /> C. EARTHWORK - WASTE PILE COVER PLACEMENT <br /> Task Nod Task Description I Cost (s) <br /> -------- -------------------------------------------------- ------------ <br /> 13 I Construct earthen cover for Mayflower Pond 4 I $83,067 <br /> I I <br /> I I <br /> I I <br /> I I <br /> ------------------------------------------------------------------------ <br /> Subtotal (C): $83,067 <br />