My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-08-03_ENFORCEMENT - C1984065
DRMS
>
Day Forward
>
Enforcement
>
Coal
>
C1984065
>
2012-08-03_ENFORCEMENT - C1984065
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:04:41 PM
Creation date
8/10/2012 7:48:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984065
IBM Index Class Name
ENFORCEMENT
Doc Date
8/3/2012
Doc Name
Paid Violation
From
J.E. Stover & Associates, Inc
To
DRMS
Violation No.
CV2012005
Email Name
SB1
ZTT
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />Civil Penalty Worksheet <br />I. Identification <br />NOWCO No.: CV- 2012 -005 <br />Date Issued: June 26, 2012 <br />Mine: Coal Ridge No. 1 Mine <br />Permit No.: C- 1984 -065 <br />Operator /Permittee: C.B. Minerals Company, LLC <br />II. Mandatory Penalties <br />Cessation Order <br />Failure to Abate - $750 to $5,000 /day x <br />Mining without a Permit <br />III. Penalty Calculation Criteria - Rule 5.04.6 <br />Source of Information or Assessment: <br />Category <br />A. History <br />0 NOVs past 12 months x $50 = $0.00 <br />0 COs past 12 months x $250 = $0.00 <br />B. Seriousness <br />Severe $1,500 $1,750 <br />Significant 00 $1,250 <br />Low /Moderate $250 $500 <br />Insignificant <br />Administrative <br />C. Faul <br />Intentional $1000 $1,250 <br />Negligence $25 $500 <br />Unavoidable $0 <br />D. Number of Days Penalty Assessed <br />E. Good Faith (May not exceed $1,250) <br />Credit - Extraordinary Effort <br />Credit - Rapid Compliance <br />Type of Violation: <br />days <br />Administrative <br />x Performance Standard <br />Permit Condition <br />Operator /Permittee <br />Comments <br />X Division <br />No NOV's duing the past tweleve months. <br />Contractor constructed an unapproved ditch on a <br />reclaimed parcel that had been Phase II bond released. <br />$750 Although, topsoil was not salvaged in advance, it was <br />not lost. Ditch was 150' long x 1.5' deep x 1.5' side. <br />There was no off -site damage. <br />$1,500 Contractor thought the unapproved ditch would help. <br />$750 Operator unaware of ditch. Minimal fault is proposed. <br />- $250.00 <br />Operator completed both abatement steps in advance of the <br />abatement deadline. $250.00 is proposed for good faith. <br />Total <br />$250.00 <br />Assessment Officer Sandra L. Brown <br />Date: July 27, 2012 <br />C -NV -02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.