BUCKLEN EQUIPMENT CO <br />BUCKLEN EQUIPMENT CO PIT - ID# M- 1982 -131 Technical Revision <br />EXHIBIT L <br />Exhibit L has been revised as follows from the Amended Mine Permit as approved April 16, 1993. <br />Deletions are indicated by &ikeeut, additions are noted by bold text. <br />RECLAMATION COSTS <br />As mentioned in Exhibit D, only a portion of the site is disturbed at any time due to mining in <br />stages and concurrent reclamation. This Mining Plan has been designed to limit the amount of <br />handling of the topsoil and overburden material. <br />In order to calculate the reclamation costs at any given time, we have selected two mining stages <br />in Phase 2 of Area A. Area B would be considered to still be in use. <br />As stated in Exhibit D, Area A will be mined at a 3HAV slope 11-1:1V slope. No baGkfillinq Of the <br />Slopes will be backfilled using unsaleable material from within the <br />mine limits which includes salvaged overburden and underlying clays. <br />greundi.vate.r. The—re-fore, any disturbed ground bp-ln-�.Ag the f*n;-;' lake elevation is not ind, ided this <br />Gent estimate. If an operator default occurs, the pit slopes would need to be reclaimed to a <br />31-1:111 slope. Area B would be leveled, scarified, topsoiled with six inches of growth medium, and <br />seeded. <br />SUMMARY OF RECLAMATION COSTS <br />Major Disturbance <br />$4,977.25 $50,115.25 <br />Moderate Disturbance <br />$5 $34,394.25 <br />Minor Disturbance <br />$25,46425 $29,092.50 <br />Total Reclamation Costs $61,664.25 $113,602.00 <br />Administrative Fee (15.8 %) $9,7464 $17,949.12 <br />Proposed Reclamation Bond $71,450.00 $131,550.00 <br />Bonded Cost per Acre at 33.16 Acres $2,154.70 $3,967.13 <br />Page 9 of 12 <br />