My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-08-09_REVISION - C1981018 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2012-08-09_REVISION - C1981018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:04:53 PM
Creation date
8/9/2012 12:58:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
8/9/2012
Doc Name
Cost Estimate (Emailed)
From
DRMS
To
Scott Wanstedt
Type & Sequence
MR153
Email Name
ZTT
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task # 002 Page 2 of 2 <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />1.000 <br />(DOZ -OC) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.902 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.5053 <br />Adjusted unit production: <br />Adjusted fleet production: <br />1,066.44 LCY/hr <br />1066.44 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.254/LCY <br />Total job time: <br />Total job cost: <br />0.20 Hours <br />$54.82 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.