Laserfiche WebLink
6 (FORM 2 - Public filing) <br />8. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re- establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />There is no topsoil present on exploration site. <br />9. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />There is no exploration drilling currently proposed. <br />10. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />The pre- exisliny aclits arid purlals will be Secured, closed, WIC/ covered completely with <br />access will be fully safegaurded from any further entry after reclamation has ocurred. <br />11. Describe how roads will be reclaimed or returned to their pre - prospecting (or better) condition: <br />The access road will be reclaimed using a backhoe and will be graded to pre - prospecting <br />topography. <br />