Laserfiche WebLink
Attachment 1 <br />Reclamation Plan <br />Reclamation would be conducted upon completion of exploration and development <br />activities. Due to the seasonal weather, proposed activities would be conducted May <br />through October. All exploration and development work is being planned for the <br />summer months with adequate time for reclamation before winter snowfall. All <br />required reclamation would be completed no later than 5 years after all exploration <br />and development work has been completed. <br />The following outlines plans for reclamation: <br />1) Backfill, reshape, and reseed as needed all holes, pits and excavations associated <br />with mining operations. <br />2) Stabilize disturbed sites during and after operations to control erosion and mass <br />wasting. <br />3) Remove all trash off of Forest Service lands. <br />4) Remove all structures from Forest Service lands with the exception of pre- <br />existing structures. <br />5) Complete all reclamation within five years of the completion of exploration and <br />development operations <br />6) Break up and disperse cut banks in the access road. <br />7) Earth work, which includes backfilling, re- contouring and smoothing, will be <br />completed with no rough piles higher than 12 inches <br />8) Divert surface run -off water from disturbed areas. <br />9) No trees will be cut or removed in association with these proposed operations <br />