My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-08-07_REVISION - C1982056
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2012-08-07_REVISION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:04:49 PM
Creation date
8/8/2012 9:22:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
REVISION
Doc Date
8/7/2012
Doc Name
Letter Application & Public Notice
From
Twentymile Coal Company
To
DRMS
Type & Sequence
PR9
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Peabod <br />Ili 1111 ENERGY <br />Twentymile Coal, LLC <br />Mr. Jason Musick, Environmental Protection Specialist <br />Colorado Division of Reclamation, Mining, and Safety <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />(303) 866 -3567 Ext, 8134 <br />29515 Routt County Road 27 <br />Oak Creek, CO 80467 <br />970.879.3800 <br />p ,CE1Ve my 31, 2012 <br />AUG 07 2012 <br />Division of Reclamation, <br />Mining & Safety <br />RE: Twentymile Coal, LLC, Foidel Creek Mine (C -82 -056) — Permit Revision (PR12 -09) for <br />Western Mining District Mine Plan Modification <br />Dear Mr. Musick: <br />Twentymile Coal, LLC (TC) respectfully requests CDRMS approval of a Permit Revision to our <br />existing approved Permit, to modify our approved mine plan for the Western Mining District (WMD) <br />to add an additional longwall panel, the 11 -Left Panel, and to include extension of the 12 -Left and 13- <br />Left Panels, and the associated development and mining of additional coal reserves. The additional <br />panel, and panel extensions of to the west, will also require modification of the Permit Area boundary <br />to encompass the extension areas, associated coal leases, and potential related subsidence areas, adding <br />approximately 560 acres to the Mine Permit Area. <br />Mining limits were initially established for the western edge of the WMD based on available <br />information on coal structure and faulting in this area. Subsequent mining and additional surface and <br />underground drilling have resulted in better definition of structural constraints and location and <br />definition of faults and fault offsets. This additional information indicates that longwall panels can <br />safely be extended further to the west and south, increasing the minable coal reserves, extending mine <br />life, and resulting in extraction of additional coal which otherwise would never be recovered. <br />Activities under the proposed mine plan modification will be limited to underground continuous -miner <br />development and longwall mining, and will not require construction of any new surface facilities. <br />Preliminary mine development (Phase I) in the WMD (Panels 17 through 18 Left), was addressed in <br />the PRO6 -07 Permit Revision submittal (approved 01/02/07), with subsequent minor modifications to <br />adjust alignment and configuration consistent with geologic controls, under TR07 -63 (approved <br />11/01/07). Phase II development activities, extending to, but not including, the un- leased (at the time) <br />Federal coal reserves in Sections 21 and 22, T5N, R87W, were approved (10/03/08) under TR07 -64. <br />TC subsequently acquired Federal Coal Lease No. COC- 72980, and submitted and obtained approval <br />(10/30/09) of PRO9 -08 addressing Phase III development and longwall mining for the remainder of the <br />WMD. This Permit Revision submittal tiers off of the previous permit approvals, and includes a <br />Federal Coal Lease Modification (modification to Federal Lease COC- 72980) to add 40 acres of <br />Federal coal (submitted on 04/20/12), a Federal Coal Lease Application, to be submitted within the <br />next two weeks, adding another 100 acres of Federal Coal, and a new fee coal lease. <br />This submittal includes revised PAP text and supporting materials, as identified by the attached <br />Summary of Revisions /Additions. Please note that since this Permit Revision application only <br />addresses underground development and mining, and will involve no surface disturbance, there are no <br />
The URL can be used to link to this page
Your browser does not support the video tag.