My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-08-07_REVISION - M1980244 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2012-08-07_REVISION - M1980244 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:04:50 PM
Creation date
8/7/2012 3:48:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
8/7/2012
Doc Name
RESPONSE TO ADEQUACY REVIEW
From
CC&V
To
DRMS
Type & Sequence
TR65
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3) Third Page (Exposed Perimeter Liner) <br />Only portions of liner that are on the geosynthetic liner to- be- installed directly along the <br />perimeter berm will remain exposed. More interior potions will remain protected by DCF. <br />There is no reason for personnel to routinely walk directly on the liner in that area, therefore, <br />foot traffic directly over the liner will be minimal. The double sided textured feature of the liner <br />will enable any personnel or wildlife that may enter the area to safely egress without damage to <br />the liner. <br />One to three lifts of ore have been placed up- gradient of the area to be lined. The benches at <br />each lift will minimize the likelihood of and material cascading down - slope. <br />At a minimum, a three foot safety berm will be placed along the perimeter to prevent vehicles <br />from damaging the liner's edge. <br />4) Drawings A501 and A502 (Freeboard) <br />A minimum of two feet of visual freeboard will be maintained along the perimeter of the newly <br />installed liner. <br />Please contact me at (719)- 689 -4055 should you have questions or wish to discuss this response. <br />Sincerely, <br />f1/4 ,ex ,v0A/1 r=�,, 6,„6_1( <br />o(P"- 07-4)— //;i0 <br />Timm Comer <br />Manager, Environmental Resources <br />xc: Sheryl Decker, Acting Teller County Planning Director <br />Byron Hakes, Mayor, City of Victor <br />Kevin Riley, Process and Interim Projects Manager, CC &V Gold Mining Company <br />
The URL can be used to link to this page
Your browser does not support the video tag.