My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-08-07_REVISION - M1980244 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2012-08-07_REVISION - M1980244 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:04:49 PM
Creation date
8/7/2012 3:48:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
8/7/2012
Doc Name
TR-65 APPROVAL
From
DRMS
To
CC&V
Type & Sequence
TR65
Email Name
TC1
BMK
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3567 <br />FAX: (303) 832 -8106 <br />August 7, 2012 <br />Mr. Timm Corner <br />Cripple Creek & Victor Gold Mining Company <br />100 N. Third Street <br />P.O. Box 191 <br />Victor, CO 80860 <br />Re: Cresson Project; DRMS File No. M- 1980 -244; <br />Technical Revision (TR -65) Approval <br />Dear Mr. Corner: <br />On August 6, 2012 the Division of Reclamation, Mining and Safety (Division) partially approved the <br />Technical Revision application submitted to the Division on June 28, 2012, addressing the following: <br />Based on discussions between CC &V and the Division, and the formal withdrawal of the proposal to reduce <br />the sampling frequency of overburden fill placement, the proposed revised Specification Change for <br />Overburden Fill Testing Frequency is not incorporated into this Technical Revision (TR -65). <br />The terms of the Technical Revision No. 65 VLF phase 5 berm raise design approved by the Division are <br />hereby incorporated into Permit No. M -1980 -244. All other conditions and requirements of Permit No. M- <br />1980 -244 remain in full force and effect. <br />The Division has reviewed this minor change for impacts to the financial warranty. The cost for reclamation <br />of the VLF Phase 5 berm raise is included in Amendment 9, Volume VII, Appendix 11. Therefore, no <br />additional financial warranty for this Technical Revision is necessary. The last revision requiring adjustment <br />to CC &V's surplus warranty was TR -60. The surplus warranty remains at $252,599.00. <br />If you have any questions, please contact me. <br />Sincerely, <br />Tim A. Cazier, P.E. <br />Environmental Protection Specialist <br />cc: Tom Kaldenbach, DRMS <br />Berhan Keffelew, DRMS <br />Office of Office of <br />Mined Land Reclamation <br />Specification change, VLF phase 5 berm raise design <br />STATE OF COLORADO <br />COLORADO <br />D I V I S I O N O F <br />RECLAMATION <br />MINING <br />— &— <br />SAFETY <br />John W. Hickenlooper <br />Governor <br />Mike King <br />Executive Director <br />Loretta Pineda <br />Director <br />Denver • Grand Junction • Durango Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.