Laserfiche WebLink
G0 NTO Uk CONSULTIN <br />ENGINEERING <br />LIndlad u.r r CINI0palley <br />Table of Contents <br />PO 984, Kittredge, CO 80457 <br />303 679 9160 f 303 679 -9180 <br />INTRODUCTION 2 <br />WORK PERFORMED 2 <br />RESULTS AND DISCUSSION 3 <br />General Chemistry (Sulfate and TDS) 4 <br />Radiochemistry 5 <br />Field Parameters 5 <br />Quality Control 5 <br />CONCLUSIONS 6 <br />GENERAL CONDITIONS 7 <br />Figures <br />Figure 1 Well and Sampling Locations <br />Figure 2 Time Versus Concentration Plots, GCC Constituents of Concern <br />Tables <br />Table 1 Results of Second Quarter, 2012, Groundwater Monitoring, GCC Rio <br />Grande, Inc., Pueblo Cement Plant, Pueblo, Colorado. Sampling Conducted <br />June 21, 2012. <br />Table 2 Results History for Parameters of Concern, Groundwater Monitoring, GCC <br />Rio Grande, Inc., Pueblo Cement Plant, Pueblo, Colorado. <br />Appendix A <br />Report # Content <br />D35749 General Chemistry analytical data for wells MW002, MW003, MW004, and <br />DUP -01 <br />D35749X Radiochemistry results for wells MW002, MW003, MW004, and DUP -01 <br />1 <br />