My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-08-03_REVISION - M2004031
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2004031
>
2012-08-03_REVISION - M2004031
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:51:37 PM
Creation date
8/6/2012 4:14:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004031
IBM Index Class Name
REVISION
Doc Date
8/3/2012
Doc Name
TR-01 COMPLIANCE LETTER
From
AGGREGATE INDUSTRIES
To
DRMS
Type & Sequence
TR1
Email Name
BMK
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TECHNICAL MEMORANDUM TETRA TECH <br />Hazeltine Reservoir <br />Surface Water Dewatering Pump Station <br />Adams County, Colorado <br />PREPARED FOR: <br />PREPARED BY: <br />DATE: <br />Introduction <br />Mike Refer, Aggregate Industries <br />Connie Davis, Aggregate Industries <br />Jeffrey Butson, P.E., Tetra Tech <br />August 3, 2012 <br />This memorandum outlines our status to date on the various requests required for the <br />construction of the proposed Hazeltine surface dewatering pump station. <br />This is the status of our requests: <br />Denver Water — The license agreement request, including the required legal description, has been <br />submitted for consideration by the property management department of Denver Water. Meetings <br />conducted with the engineering department were positive and we do not expect significant delays <br />for engineering questions. A copy of the legal description is attached. <br />Xcel Energy — Xcel has informed us that a license /encroachment agreement is needed to cross <br />the high pressure gas lines. This agreement will be processed as quickly as possible. The <br />engineering department indicated that there are some minor conditions they would like us to <br />observe during construction, as shown in the attached e-mail. <br />Fulton Ditch Irrigation Company — Written approval of our plan was granted after a site meeting <br />with the ditch company. This written approval is attached. <br />United Power — United Power has confirmed that they are responsible for the power to the <br />handhole as indicated in the plans. United Power is currently verifying that the existing line has <br />sufficient capacity to power the pump station. <br />Estimated Cost of Operations and Maintenance — The estimated costs of operating and <br />maintaining the dewatering pump station is $2,516 per year. The calculations are attached. <br />Attachements <br />P \23514 \133 - 23514- 12003\Does \Techmcal Memorandum - Coordination Status docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.