My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-07-27_PERMIT FILE - P2012012
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2012012
>
2012-07-27_PERMIT FILE - P2012012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:04:08 PM
Creation date
8/6/2012 4:12:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2012012
IBM Index Class Name
PERMIT FILE
Doc Date
7/27/2012
Doc Name
INITIAL ADEQUACY REVIEW
From
DRMS
To
SANTIAGO MINING
Email Name
TAK
AJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
it in low permeability liners and cover prior to revegetation. Please provide an encapsulation design and <br />a map showing the location of the proposed waste rock stockpile. Encapsulation designs must be <br />prepared by a geotechnical engineer or other qualified person. <br />8. PROJECT DESCRIPTION, Item 6.0 Please commit to stopping excavation activities and notifying <br />DRMS for consultation if water is encountered during surface or underground excavation. <br />9. PROJECT DESCRIPTION, Items 6.0 and 6.G. Please reconcile the apparent discrepancy between the <br />disturbance area shown in Item 6C (100 feet X 30 feet, or 3,000 square feet) and the disturbance area <br />shown in Item 6G (0.75 acre, or 32,670 square feet). <br />10. PROJECT DESCRIPTION, Items 6.D and 6.F. Will road improvements include widening a road or <br />changing the gradient of a road? <br />11. PROJECT DESCRIPTION, Item 6.E. Will there be secondary containment for the storage tanks? <br />12. PROJECT DESCRIPTION, Item 6.J. Please identify the sources of the water referred to in "waters from <br />the Santiago" and any "discharges from the Santiago ". Does this water discharge from underground <br />mine workings? <br />13. PROJECT DESCRIPTION, Item 6.J. Please explain why "CDPHE will monitor any discharges from the <br />Santiago "? , <br />14. PROJECT DESCRIPTION, Item 6.J. Please provide the following information: <br />Page 2 of 3 <br />a. The distance from the disturbed area to the nearest stream. <br />b. When a discharge permit will be applied for under the Colorado Discharge Permit System (if <br />there will be a surface water discharge from the disturbed area), or an impoundment design (if all <br />discharges will be contained in the disturbed area). <br />c. A plan for sampling surface water discharges. <br />d. Available information pertaining to depth of ground water. If such information is unavailable, <br />then please commit to logging the depth of ground water intercepted in all drillholes approved <br />and drilled under this NOI. <br />e. Expected dewatering activities for the underground workings. <br />15. OPERATION AND RECLAMATION MEASURES, Item 4. Please commit to: <br />a. Plugging the entire lengths of the drillholes with either tremied cement grout (if the hole is dry) or <br />high quality sodium bentonite gel (if water is encountered during drilling), <br />b. Plugging the drillholes immediately after drilling is completed, and <br />c. Stopping drilling and notifying DRMS to confer on plugging, if voids are encountered during <br />drilling. <br />16. OPERATION AND RECLAMATION MEASURES, Item 4. The DRMS understands that a secure <br />closure with gated access has been installed on the Santiago Mine 5 Level portal by the DRMS Inactive <br />Mine Program. Please provide a commitment that activities under the NOI will not alter or remove the <br />portal closure, or if you will alter or remove the closure, please provide dimensions for the portal so that <br />replacement costs can be estimated for establishing the amount of required bond. <br />17. OPERATION AND RECLAMATION MEASURES, Item 4. Please add to the door closure description <br />for the proposed new adit that the door will be constructed of steel. <br />
The URL can be used to link to this page
Your browser does not support the video tag.