Laserfiche WebLink
07/27/2012 10:18 3036747605 PAGE 13/14 <br />pRi% <br />B. Bond. Reclamation o all disturbances diiti wit� `"�` is plan of o ra#i .as, covered by <br />, Reclamation Performance Bond Nom; -Kted (nun/ la / `.4x s g ad '�i'' 4 (Principal) <br />( And S r e penal sum of.3c 4. Ogg is Reclamation Performance Bond is a <br />guarantee of faithful performance with the terms and conditions listed below, and with the <br />reclamation requirements agreed upon in the plan of operations. This Reclamation Performance <br />Bond also extends to and includes any unauthorized activities conducted in connection with this <br />operation. �, ; ' A 1.. j-,, n tx / <br />The bond amount for this Reclamation Performance Bond was based on a bond calculation <br />worksheet. The bond amount may be adjusted during the term of this proposed plan of <br />operations in response to changes in the operations or to changes in the economy. Both the <br />Reclamation Performance Bond and the bond calculation worksheet are attached to and made <br />part of this plan of operations. <br />Acceptable bond securities (subject to change) include: <br />1. Negotiable Treasury bills and notes which are unconditionally guaranteed as to both principle <br />and interest in an amount equal at their par value to the penal sum of the bond; or <br />2. Certified or cashier's check, bank draft, Post Office money order, cash, assigned certificate of <br />deposit, assigned savings account, blanket bond, or an irrevocable letter of credit equal to the <br />penal sum of the bond. <br />VS. TERMS AND CONDITIONS <br />A. If a bond is required, it must be furnished before approval of the plan of operations. <br />B. Information provided with this plan marked confidential will be treated in accordance with the <br />agency's laws, rules, and regulations. <br />C. Approval of this plan does not constitute certification of ownership to any person named herein <br />and/or recognition of the validity of any mining claim named herein. <br />D. Approval of this plan does not relieve me of my responsibility to comply with other applicable <br />state or federal laws, rules, or regulations. <br />E. If previously undiscovered cultural resources (historic or prehistoric objects, artifacts, or sites) <br />are exposed as a result of operations, those operations will not proceed until notification is <br />received from the Authorized Officer that provisions for mitigating unforeseen impacts as <br />required by 36 CFR 228.4(e) and 36 CFR 800 have been complied with. <br />F. This plan of operations has been approved for a period of or until (mm/) . A new <br />or revised plan must be submitted in accordance with 36 CFR part 228, subpart A, if operations <br />are to be continued after that time period. <br />of more space is needed W Jill nit a black afInfermation, use additional sheets and attach farm) <br />-8- <br />