Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 002 Page 2 of 2 <br />Visibility: <br />Jab efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFTIDAY) <br />0.800 <br />(FND -R.F) <br />1.225 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.868 <br />(CAT 1413) <br />1.000 <br />(PAT) <br />Net correction. 0.4766 <br />Adjusted unit production: <br />Adjusted fleet production <br />JOB TIME AND COST <br />819.23 LCYihr <br />1638.46 LCY/hr <br />Fleet size: 2 Dozer(s) <br />Unit cost: 50.4051I.CY <br />Total job time: 54.93 Hours <br />Total job cost: $36,483.22 <br />CIRCES Cost Estimating Sollwary <br />