Laserfiche WebLink
Page 1 of 2 <br />BULLDOZER WORK <br />Task description: Re rade Rail Lon <br />Site: Hayden Gulch Loadout Permit Action. SLl Permit/Job #: C1992081 <br />PROJECT IDENTIFICATION <br />Task #: 001 State: <br />Date: 6/15/2012 County: <br />User: JLE <br />Colorado <br />Routt <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Horsepower: <br />Slade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />Cat D10T - 10SU <br />574 <br />Semi - Universal <br />3 -shank ripper <br />_1 per day <br />(CRG <br />Abbreviation; <br />Filename: <br />Total unit CostlHour: <br />Total Fleet Cost/Hour: <br />$340.43 <br />$680,86 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />Swell factor: <br />Loose volume: <br />64,000 <br />1.125 <br />72,000 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />]HOURLY PRODUCTION <br />Average push distance: 200 feet <br />Unadjusted hourly production: 946.0 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: -10% <br />Average site altitude: 6,400 feet <br />Material weight: 2,650 lbs/LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor <br />Source <br />Utilizationi°!o <br />Owncrship Cost/Hour: <br />$111.83 <br />NA <br />Operating Cost/Hour: <br />$181.78 <br />100 <br />Ripper op. Cost/Hour: <br />$8.34 <br />100 <br />Operator Cost/Hour: <br />$38.49 <br />NA <br />Total unit CostlHour: <br />Total Fleet Cost/Hour: <br />$340.43 <br />$680,86 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />Swell factor: <br />Loose volume: <br />64,000 <br />1.125 <br />72,000 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />]HOURLY PRODUCTION <br />Average push distance: 200 feet <br />Unadjusted hourly production: 946.0 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: -10% <br />Average site altitude: 6,400 feet <br />Material weight: 2,650 lbs/LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor <br />Source <br />Operator Skill: 0.750 <br />(AVG.) <br />Material consistency: 0.900 <br />(CAT HB <br />Dozing method: 1.000 <br />GEN. <br />None <br />0081 -001 <br />CIRCES Cost Estimating Soltware <br />