Laserfiche WebLink
PROJECT: RPEE <br />LOCATION: Somerset <br />CLIENT: Mountain Coal Company <br />RELATIVE COMPACTION TEST RESULTS <br />PROJECT NO: M12005MT <br />ENGINEERING TECHNICIAN: ,Hayes <br />NUCLEAR GAUGE USED: 18 <br />DATE: Thursday, May /31/12 <br />REMARKS: The test results indicate only the density and moisture content for the location and elevation tested only. <br />xanthert anzt Arancittitz <br />PROJECT NUMBER: M12005MT <br />TEST LOCATION <br />DEPTH OR <br />ELEVATION <br />PROBE <br />DEPTH <br />(IN) <br />LABORATORY <br />PROCTOR <br />DENSITY <br />(PCF) <br />OPTIMUM <br />MOISTURE <br />CONTENT <br />( %) <br />DRY <br />DENSITY <br />(PCF) <br />MOISTURE <br />CONTENT <br />( %) <br />RELATIVE <br />COMPACTION <br />( %) <br />SOIL TYPE <br />139 <br />RPEE — 01 <br />Lower Lift <br />8 <br />98.0 <br />12.0 <br />95.8 <br />14.5 <br />98 <br />Coal gob, black <br />140 <br />RPEE — 02 <br />" <br />8 <br />98.0 <br />12.0 <br />94.2 <br />15.6 <br />96 <br />" " <br />141 <br />RPEE — 03 <br />" <br />8 <br />98.0 <br />12.0 <br />99.0 <br />12.3 <br />100 <br />" " <br />142 <br />RPEE — 04 <br />Upper Lift <br />8 <br />98.0 <br />12.0 <br />99.7 <br />15.0 <br />100 <br />143 <br />REEE — 05 <br />" <br />8 <br />98.0 <br />12.0 <br />98.7 <br />17.6 <br />100 <br />" " <br />144 <br />RPEE — 06 <br />" <br />8 <br />98.0 <br />12.0 <br />95.9 <br />14.9 <br />98 <br />" cc <br />PROJECT: RPEE <br />LOCATION: Somerset <br />CLIENT: Mountain Coal Company <br />RELATIVE COMPACTION TEST RESULTS <br />PROJECT NO: M12005MT <br />ENGINEERING TECHNICIAN: ,Hayes <br />NUCLEAR GAUGE USED: 18 <br />DATE: Thursday, May /31/12 <br />REMARKS: The test results indicate only the density and moisture content for the location and elevation tested only. <br />xanthert anzt Arancittitz <br />PROJECT NUMBER: M12005MT <br />