Laserfiche WebLink
Puttixert mei c &zzariartez <br />CONSULTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br />DAILY FIELD REPORT - FIELD DENSITY TESTS <br />Date: Tuesday, 5/22/2012 <br />Arrive Time: 12:45 PM <br />Depart Time: <br />Project Name: RPEE <br />Weather: Clear, breezy <br />Project Number: M12005MT <br />Temp: <br />Client: Mountain Coal Company <br />Client Representative: <br />General Contractor: <br />Supervisor: Mike Peacock <br />Specialty Contractor: Con - <br />Specialty Superintendent or Foreman: Larry Kendall <br />Source of Fill Material: Wash Plant <br />Plans and Specs: <br />Prepared by: Dated: <br />Contractor's Equipment Used: Water truck, blade, dozer, haul trucks, loader, sheepsfoot compactor <br />Lambert and Associates Equipment Used - Manufacturer: CPN Serial Number or Unit Number: 18 <br />Test Results were Verbally Given On -Site to: Larry Kendall <br />Expected Conditions Observed: Yes <br />Unexpected Conditions Observed: No <br />Unusual Conditions Observed: No <br />If yes, who was contacted? <br />Follow -up from Prior Vi Retests Performed: No <br />Concerns for Next Visit: Retests Needed: No <br />Other personnel contacted on -site: name /firm <br />Notes: <br />I performed nuclear field density tests as requested by Larry Kendall of material being placed for fill at the RPEE. Larry <br />showed the technician the area that was prepared and ready for testing. Lambert and Associates' technician chose the <br />test locations within the area that was ready for testing. Please refer to the these results sheets for approximate test <br />locations and test results. The test results indicate only the relative compaction and soil moisture content of the material <br />tested at the elevation and location tested at the time of our site visit. <br />Lambert and Associates Technician: Hayes <br />