My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-08-01_REVISION - C1981038 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
2012-08-01_REVISION - C1981038 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:04:37 PM
Creation date
8/6/2012 1:30:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
REVISION
Doc Date
8/1/2012
Doc Name
Revised Application for a Partial Bond Release
From
J.E. Stover & Associates, Inc
To
DRMS
Type & Sequence
SL4
Email Name
BFB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. E. STOVER & ASSOCIATES, INC. <br />P.O. BOX 60340 <br />GRAND JUNCTION, COLORADO 81506 <br />PHONE: (970) 245 -4101, FAX 242 -7908 <br />MINE ENGINEERING CIVIL ENGINEERING <br />MINE RECLAMATION CONST. MANAGEMENT <br />July 30, 2012 <br />Brock Bowles <br />Division of Reclamation, Mining & Safety <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: Bowie Resources LLC, Bowie No. 1 Mine <br />Request for Partial Bond Release <br />Permit C -1981 -038 <br />Dear Mr. Bowles: <br />Aubuizui2 <br />Divisio of Reclamation, <br />Mining and Safety <br />The follow information comprises Bowie Resources LLC's revised application for a partial bond <br />release for its Bowie No. 1 Mine. <br />Based on a Field Inspection conducted June 28, 2012, two changes have been made to the <br />application and are detailed in item no. 7, 1) asphalt removal and narrowing of the road conducted <br />in 2009 was added to the 2009 Reclamation Activities, and 2) Zone 1 -C was inadvertently left out of <br />the application initially filed and was added as part of the 2008 activities. The acreage listed for <br />Zone 1 -C also includes the area discussed in the inspection report. The revisions in the application <br />are hi- lighted in red text. Figure 1 has been revised to show the roads, and the increase in area for <br />Zone 1C. <br />In the Hydrologic Balance Portion of the inspection report, it was noted that riprap in the lower <br />segment of Ditch 7 may be too large. A technical revision will be submitted to address the type and <br />size of channel lining pertaining to Ditch 7. <br />Item number 12, the requested amount for bond release has been increased. The increase in <br />requested amount is due to not including the reclamation costs associated with the roads ($3,000) <br />with the initial bond release application, and overlooking approximately $21,400 in reclamation costs <br />associated with reclamation activities pertaining to the coal mine waste pile. <br />Items No. 17 and 18 were submitted under separate cover and will not be revised based on the <br />revised bond release application; Item No. 17, was part of the original bond release application <br />dated March 12, 2012. Item No. 18, was mailed to DRMS on April 23, 2012. <br />1. Date of Request: March 12, 2012 <br />REVISED: July 30, 2012 <br />2. Permittee: Bowie Resources LLC <br />3. Permit No. C- 1981 -038 <br />5 Lq <br />
The URL can be used to link to this page
Your browser does not support the video tag.