Laserfiche WebLink
Analytical <br />Laboratories <br />GCC Energy, LLC <br />6473 CR 120 <br />Hesperus CO, 81326 <br />Project Quarterly <br />Project Name / Number King I & King II <br />Project Manager Tom Bird <br />Reported: <br />07/20/12 15 31 <br />Analyte <br />Result <br />Reporting <br />Lunit Units Dilution Analyzed Method Notes Analyst <br />General Chemistry <br />Alkalinity, Bicarbonate <br />Alkalinity, Carbonate <br />Alkalinity, Hydroxide <br />Alkalinity, Total <br />pH <br />Sulfate <br />TDS <br />Dissolved Metals by ICP <br />Calcium 43.5 1 00 ing/L 1 07/02/12 200 7 JGS <br />Hardness 214 6 62 mgCaCO3 /L 1 07/02/12 2340B JGS <br />Iron ND 0 050 mg/L 1 07/02/12 200 7 JGS <br />Magnesium 25.5 1 00 mg/L 1 07/02/12 200 7 JGS <br />Manganese 0.008 0 005 mg/L 1 07/02/12 200 7 JGS <br />Sodium 8.85 1 00 mg/L 1 07/02/12 200 7 JGS <br />Green Analytical Laboratories <br />Debbie Zufelt, Reports Manager <br />dzutelt /t grcenanaly tical com p 970 247 4220 f 970 247 4227 75 Suttle Street Durango, CO 81303 <br />www.GreenAnalytical.com <br />#3 Hay Gulch Ditch <br />King II <br />1206148 -04 (Water) <br />149 10 0 mg/L 1 07/13/12 232013 <br />ND 10 0 mg/L 1 07/13/12 2320 B <br />ND 10 0 mg/L 1 07/13/12 2320 B <br />157 10 0 mg/L 1 07/13/12 2320 B <br />8.47 pH Units 1 06/27/12 150 1 <br />70.0 10 0 mg/L 1 07/11/12 4500SO4 E <br />225 10 0 mg/L 1 06/29/12 160 1 <br />H2 ABP <br />1-12 ABP <br />H2 ABP <br />H2 ABP <br />MJV <br />ABP <br />ABP <br />The results in this report apply to the samples analyzed in accordance with the chain of <br />custody document This analytical report must be reproduced m its entirety In no event <br />shall Green Analytical Laboratories be liable for incidental or consequential damages <br />GALs liability, and clients exclusive remedy for any claim arising, shall be limited to the <br />amount paid by client for analyses All claims, including those for negligence and any other <br />cause whatsoever, shall be deemed waived unless made in writing and received within <br />thirty days after completion of the applicable service <br />Page 6 of 12 I <br />