My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-08-02_REVISION - C1992081
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1992081
>
2012-08-02_REVISION - C1992081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:04:40 PM
Creation date
8/3/2012 7:35:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Revision
Doc Date
8/2/2012
Doc Name
Decision Letter & Form
From
DRMS
To
Hayden Gulch Terminal, LLC
Type & Sequence
TR9
Email Name
JLE
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />COST SUMMARY WORK <br /> <br />Task description: Reclamation Cost Estimate TR9 <br /> <br />Site: Hayden Gulch Loadout Permit Action: TR9 Permit/Job#: C1992081 <br /> <br />PROJECT IDENTIFICATION <br /> <br />Task #: A01 State: Colorado Abbreviation: None <br />Date: 6/18/2012 County: Routt Filename: C081-A01 <br />User: JLE <br /> <br /> <br />Agency or organization name: DRMS <br /> <br />TASK LIST (DIRECT COSTS) <br /> <br /> Form Fleet <br />Task <br />Task <br />Hours Cost <br />Description Used Size <br />001 Regrade Rail Loop DOZER 2 79.85 $54,365.05 <br />002 Regrade Rail Spur DOZER 2 54.93 $36,483.22 <br />003 Regrade Facilities Area; Office/Parking Lot DOZER 1 5.94 $1,971.29 <br />006 Rip Facilities Area RIPPER 1 2.03 $693.00 <br />007 Rip Haul Road HGLF-HR1 RIPPER 1 2.65 $905.00 <br />011 Regrade Haul Road HGLF-HR1 DOZER 1 6.34 $2,157.06 <br />015 Finish Grade Disturbed Area GRADER 1 56.63 $7,609.00 <br />018 Regrade Truck Loop Pond DOZER 1 1.68 $558.74 <br />019 Regrade Rail Loop Pond DOZER 1 5.70 $1,891.62 <br />020 Regrade All Ditches DOZER 2 8.41 $5,587.41 <br />021 Regrade Leach Field DOZER 1 6.73 $2,234.96 <br />024 Replace Topsoil on Rail Loop and Facilities Area SCRAPER1 1 122.73 $88,763.87 <br />025 Replace Topsoil on Rail Spur SCRAPER1 1 24.87 $17,986.20 <br />028 Seal Alluvial Wells HGDAL3 and 4 BOREHOLE 1 0.00 $132.84 <br />031 Drill Seed Mix #1 REVEGE 1 57.20 $57,293.12 <br />032 Drill Seed Mix #2 REVEGE 1 2.40 $2,070.52 <br />033 Drill Seed Mix #3 REVEGE 1 42.90 $45,057.36 <br />034 Hydroseed Mix #3 REVEGE 1 2.00 $2,746.78 <br />037 Demolish and Remove Structures DEMOLISH 1 0.00 $181,037.98 <br />040 Clean Sediment from Ponds Once During Liability TRUCK1 1 7.01 $3,588.02 <br />Period <br />041 Site Maintenance Over the Ten-Year Liability SITEMAINT1 80.00 $10,795.20 <br />Period $52,676 ENANCE <br />045 Mob/Demob equip. for Reclamation of Loadout MOBILIZE 1 3.60 $9,491.65 <br />Area and TAHR <br />046 Mob/Demobilization for Pond Removal MOBILIZE 1 3.60 $3,578.11 <br />047 Mob/Demobilization for Maintanence and Pond MOBILIZE 1 3.60 $5,710.47 <br />Cleaning <br />501 Rip TAHR RIPPER 2 55.40 $38,297.00 <br />502 Remove TAHR Surface Material to Pit SCRAPER1 2 104.56 $172,490.57 <br />503 Grade TAHR to Blend GRADER 1 66.61 $9,167.00 <br />504 Replace Topsoil from Stockpile A to TAHR SCRAPER1 2 33.69 $55,577.14 <br />Stations 114 to 216 <br />505 Replace Topsoil from Stockpile C to TAHR SCRAPER1 2 27.76 $45,789.03 <br />Stations 92 to 144 <br />506 Replace Topsoil from Stockpile D to TAHR SCRAPER1 2 9.64 $15,900.95 <br />Stations 76 to 92 <br />507 Replace Topsoil from Stockpile E to TAHR SCRAPER1 2 15.58 $25,700.35 <br />Stations 40 to 76 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.