Laserfiche WebLink
SEDCAD 4 for Windows <br /> goon_)nn7 o oi i c ti,., ti <br /> B-Seam Dewatering System <br /> 10yr - 24hr event <br /> Primary spillway on Last Chance Pond is user defined base off of <br /> manufacturer data for 1,0'H Flume (Tracom), <br /> Note: Structure #1 (Dewatering Pond#3), SWS#4 was added to <br /> simulate the volume of 100 gpm (0.22 cfs) coming from <br /> dewatering discharge during the peak storm event. Acreage of <br /> this SWS was adjusted to match the increase in flow. <br /> Dewatering Ponds #1 and#2 were not modeled to allow for a <br /> conservative approach and operational flexibility to divert flow <br /> around these ponds for maintenance. <br /> Scott Wanstedt <br /> Blue Mountain Energy, Inc. <br /> 3607 CR 65 <br /> Rangely, CO 81648 <br /> Phone: 970-675-4322 <br /> Email: swanstedt@deserado.com <br /> Filename:Dewatering Model-10-yr As-Builts 6-12.sc4 Printed 07-18-2012 <br />