Laserfiche WebLink
SEDCAD 4 for Windows <br /> !`nn„n,.h4 1000-9nn7 Pamch 1 Ghwnh <br /> I <br /> B-Seam Dewatering System <br /> 25yr - 24hr event <br /> Primary spillway on Last Chance Pond is user defined base off <br /> of manufacturer data for 1.0'H Flume (Tracom), <br /> Note: Structure #1 (Dewatering Pond #3), SWS#4 was <br /> added to simulate the volume of 100 gpm (0.22 cfs) coming <br /> from dewatering discharge during the peak storm event, <br /> Acreage of this 5W5 was adjusted to match the increase in <br /> flow. <br /> Dewatering Ponds #1 and #2 were not modeled to allow for a <br /> conservative approach and operational flexibility to divert <br /> flow around these ponds for maintenance. <br /> Scott Wanstedt <br /> Blue Mountain Energy, Inc. <br /> 3607 CR 65 <br /> Rangely, CO 81648 <br /> Phone: 970-675-4322 <br /> Email: swanstedt@deserado.com <br /> Filename:Dewatering Model-25-yr As-Builts 6-12.sc4 Printed 07-18-2012 <br />