Laserfiche WebLink
been removed. Several structures facilities were never constructed. <br />According to the reclamation plan, these facilities are to be demolished and removed from the site. <br />OBSERVATIONS AND FINDINGS <br />III. <br />The following discussion of observations and findings focuses on structure demolition, the results of <br />backfilling and grading work and drainage reestablishment in the SL-1 area. The evaluation of the bond <br />release request included the bond release inspection, past inspection reports, an office review of the <br />permit requirements and regulatory criteria and the submitted material in the SL-1 application. <br />During the Phase I bond release inspection, the participants walked through the bond release request area <br />to allow for visual assessment of compliance with pertinent requirements as described above in Section <br />II of this document. All of the data used to confirm the post-mining topography was collected with a <br />Trimble YUMA handheld GPS unit and Trimble Terrasync software. The data was analyzed with <br />Trimble Pathfinder Office 5.3, ESRI ArcMap 10 and Microsoft Excel 2007. The June 5, 2010 <br />inspection report details the findings from the inspection. A summary of the observations are discussed <br />below and the details are further discussed in the inspection report. <br />Structure Demolition <br /> <br />The following structures were removed from the site: <br /> <br />1.Truck Dump Hopper <br /> <br />2.Dump Hopper Conveyor Tunnel <br /> <br />3.Dump Hopper Conveyor <br /> <br />4.Crusher Building <br /> <br />5.Stacker Tube <br /> <br />6.Stacker Conveyor <br /> <br />7.Powerhouses (2) <br /> <br />8.Dust Suppression Pressure Tank Building <br /> <br />9.Dust Suppression System Building <br /> <br />10.Water Storage Tank <br /> <br />11.Loadout Building <br /> <br />12.Loadout Belt <br /> <br />13.Haul Roads and Access Roads <br />The following structures have been requested for release. These structures were proposed in the permit <br />and , but they were never <br />constructed. <br /> <br />1.Railcar Positioner and Hopper <br /> <br />2.Railcar Dump Hopper Belt Tunnel <br /> <br />3.Dump Hopper Conveyor Tunnel <br /> <br />4. <br /> <br />5.Radial Stacker Pad <br />6 <br />