My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-07-27_REVISION - C1992081 (6)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1992081
>
2012-07-27_REVISION - C1992081 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:04:09 PM
Creation date
7/31/2012 11:02:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Revision
Doc Date
7/27/2012
Doc Name
Proposed Decision Letter & Form and Cost Estimate
From
DRMS
To
Hayden Gulch Terminal, LLC
Type & Sequence
SL1
Email Name
JLE
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 oft <br />BULLDOZER WORK <br />Task description: Re grade Leach Field <br />Site: Hayden Gulch Loadout Permit Action: SLI PermitlJob #: C]992081 <br />PROJECT IDENTIFICATION <br />Task #: 021 State <br />Date: 6/15/2012 County <br />User. JLE <br />Colorado <br />Route <br />Agency or urbanization name: DBMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />Cat DiOT - 10SU <br />574 <br />Semi- Universal <br />3 -shank ripper <br />I per day <br />(CRG) <br />Abbreviation: <br />Filename: <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />$332.09 <br />$332.119 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />Swell factor: <br />Loose volume: <br />4,000 <br />1.125 <br />4,500 LCY <br />Source of estimated volume; Division of Reclamation. Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production <br />100 feet <br />1,718.9 LCYIhr <br />Materials consistency description; _ Compacted fill or embankment 0.9 <br />Average push gradient: 0% <br />Average site altitude: 6,400 feet <br />Material weight: 2,650 lbs/LCY <br />Weight description: Decomposed rock - 25% Rock. 75% Earth <br />Job Condition Correction Factor <br />Source <br />Utilization % <br />Ownership Cost/Hour: <br />$111.83 <br />NA <br />Operating Cost/Hour: <br />$181.78 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator CostlHour: <br />$38.49 <br />NA <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />$332.09 <br />$332.119 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />Swell factor: <br />Loose volume: <br />4,000 <br />1.125 <br />4,500 LCY <br />Source of estimated volume; Division of Reclamation. Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production <br />100 feet <br />1,718.9 LCYIhr <br />Materials consistency description; _ Compacted fill or embankment 0.9 <br />Average push gradient: 0% <br />Average site altitude: 6,400 feet <br />Material weight: 2,650 lbs/LCY <br />Weight description: Decomposed rock - 25% Rock. 75% Earth <br />Job Condition Correction Factor <br />Source <br />Operator Skill: 0.750 <br />(AVG.) <br />Material consistency: 0.900 <br />CAT HB <br />Dozing method: 1.000 <br />GEN. <br />None <br />0081 -02.1 <br />CIRCES Cast Estiā¬uting Sonware <br />
The URL can be used to link to this page
Your browser does not support the video tag.