Laserfiche WebLink
Pagel oft <br />BULLDOZER WORK <br />Task description: lte rade Rail Loop Pond <br />Site: Hayden Gulch Loadout Permit Action: SLl Permit/Job #: C1992081 <br />PROJECT IDENTIFICATION <br />Task #: 019 State: Colorado <br />Date: 6/15/2012 County: Routt <br />User: JLE <br />Agency or organization name: <br />DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat DIOT - 10SU <br />Horsepower: <br />571 <br />Blade Type: <br />Semi- Universal <br />Attachment; <br />3 -shank ripper <br />Shift Basis: <br />I per day <br />Data Source: <br />CRG) <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: 0081 -019 <br />Total unit Cost/Hour. $332.09 <br />Total Fleet Cost/Hour: $332,09 <br />MATERIAL QUANTITIES <br />Source <br />Utilization % <br />Ownership Cost/Hour: <br />$111.83 <br />NA <br />Operating Cost/Hour: <br />$181.78 <br />100 <br />Ripper op, Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.49 <br />NA <br />Total unit Cost/Hour. $332.09 <br />Total Fleet Cost/Hour: $332,09 <br />MATERIAL QUANTITIES <br />Source <br />Initial Volume: <br />3,000 <br />Swell factor: <br />1.125 <br />Loose volume: <br />3,375 LCY <br />Source of estimated volume: Division of Reclamation, Minim & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />150 feet <br />1,243.2 LCY /hr <br />Materials consistency description; Compacted fill or embankment 0.9 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />-10% <br />6,100 feet <br />2,650 lbs /LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor <br />Source <br />Operator Skill: 0.750 <br />(AVG.) <br />Material consistency: 0.900 <br />CAT HB <br />Dozing method: 1.000 <br />(G EN.) <br />CIRCES Cost Estimating Software <br />