Laserfiche WebLink
Bulldozer Worksheet Cont'd Task 4 011 Page 2 of 2 <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFTIDAY) <br />0.800 <br />(FND -RF) <br />1.000 <br />(CAT HB) <br />1.000 <br />(SCAT HB) <br />0.868 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.3890 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />666.65 LCYIhr <br />668.65 LCYlhr <br />Fleet size: 1 Dozers) <br />Unit cost: $0.5091LCY <br />Total job time: <br />Total job cast: <br />6.34 Hours <br />$2,157.06 <br />CIRCES Cost Estimating Software <br />