My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-07-27_REVISION - C1992081 (6)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1992081
>
2012-07-27_REVISION - C1992081 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:04:09 PM
Creation date
7/31/2012 11:02:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Revision
Doc Date
7/27/2012
Doc Name
Proposed Decision Letter & Form and Cost Estimate
From
DRMS
To
Hayden Gulch Terminal, LLC
Type & Sequence
SL1
Email Name
JLE
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER RIPPING WORK <br />Task description: Rip Haul Road HGLF -HRl <br />Site: Hayden Gulch Loadout Permit Action: SL1 Permitllob#: 01992081 <br />PROJECT IDENTIFICATION <br />Task #: 007 State: Colorado Abbreviation: None <br />Date: 6/15/2012 County: Routt Filename: C081 -007 <br />User: JLE <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat ❑IOT - l OSU Horsepower: 574 <br />Ripper Attachment: 3 -Shank Ripper Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper Operating; Cost/Hour. <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />Total Fleet Cost/Hour. <br />MATERIAL QUANTITIES <br />Alternate Methods: <br />Seismic: NA <br />Area: 2.09 acres <br />$111.83 <br />Utilization % <br />NA <br />$181.78 <br />100 <br />$9.34 <br />100 <br />$38.49 <br />NA <br />$ 340.43 <br />$340.43 <br />Selected estimating method: Area <br />Bank Volume: NA <br />Rip Depth (ft): 2.50 <br />Source of estimated quantity: PAP Volume II, Tab 12 <br />HOURLY PRODUCTION <br />Seismic: <br />BCY <br />Volume: <br />NA <br />8,430 BCY or CCY <br />Seismic Velocity: <br />NA <br />feet/second <br />Area: <br />Average Ripping Depth: <br />2.87 <br />mph <br />Average Ripping Width: <br />8.67 <br />degrees <br />Average Ripping Length: <br />200.00 <br />feet <br />Average Dozer Speed: <br />88.00 <br />feet <br />Average Maneuver Time: <br />0.25 <br />feet <br />Production per unit area: <br />0.947 <br />acre"our <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: <br />0.947 <br />Acres/hr <br />Site Altitude: <br />6,400 <br />feet <br />Altitude Adj: <br />1.00 <br />(CAT HB) <br />Job Efficiency: <br />0.83 <br />(1 shift/day) <br />Net Correction: <br />0.83 <br />multiplier <br />Adjusted Hourly Unit Production: <br />0.79 <br />Acres/hr <br />Adjusted Hourly Fleet Production: <br />0.79 <br />Acres/hr <br />JOB TIME AND COST <br />FIeet size: 1 Grader(s) <br />Total job time: <br />2.66 Hours <br />Unit cost: $433.219 Per acre <br />Total job cost: <br />$905.00 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.