Laserfiche WebLink
Bulldozer Worksheet Cont'd Task ft 003 Page 2 of 2 <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 <br />(AVG. ) <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(FND -RF) <br />1.115 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.868 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.4338 <br />Adjusted unit production: 745.66 LCYIhr <br />Adjusted fleet production: 745.66 LCYIhr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cast: $0.445fLCY <br />Total job time: <br />Total job cost: <br />5.94 Hours <br />$1,971.29 <br />C]RCES Cast Estimating; Software <br />