Laserfiche WebLink
Page 1 of 2 <br />SCRAPER TEAM WORK <br />Task description: Replace Topsoil from Stockpile D to TAHR Stations 76 to 92 <br />Site: Hayden Gulch Loadout PerntitAction: SL1 PermitlJob#: C1992081 <br />PROJECT IDENTIFICATION <br />Task #: 506 State: Colorado <br />Date: 6/18/2012 County: Routt <br />User. JLE <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />Abbreviation: None <br />Filename: 0081 -506 <br />COSTShift basis: l per day <br />- Scraper: I Cat 637G w1 ush- ull <br />- Dozer NA <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Cost Breakdown: Scraper Work Team <br />NA <br />NA <br />CAT 14M <br />Water Tanker, 10,000 Gal. <br />Sunnort Eouinment <br />Maintenance Eauinment <br />Total work team cost/hour: $1.649.711 <br />MATERIAL OUANTITIES <br />Initial volume: 11,747 CCY Swell factor: 1.000 <br />Loose volume: 11,747 LCY <br />Source of estimated volume: Seneca II -W Permit Table 21 -3 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />25 <br />25 <br />Ownership cost/hour: <br />$103.90 <br />NA <br />NA <br />NA <br />$39.30 <br />$54.65 <br />Operating costlhour: <br />$232.77 <br />NA <br />NA <br />NA <br />$16.78 <br />$29.31 <br />Ripper op. costihour: <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$24.95 <br />NA <br />NA <br />NA <br />$24.47 <br />$38.70 <br />Unit Subtotals: <br />$361.62 <br />NA <br />NA <br />NA <br />$80.54 <br />$122.68 <br />Number of Units: <br />4 <br />0 <br />0 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$1,446.48 <br />Support: <br />$0,00 <br />Maint: <br />$203.22 <br />Total work team cost/hour: $1.649.711 <br />MATERIAL OUANTITIES <br />Initial volume: 11,747 CCY Swell factor: 1.000 <br />Loose volume: 11,747 LCY <br />Source of estimated volume: Seneca II -W Permit Table 21 -3 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />CIRCES Cost Estimeung Software <br />Scraper Bowl (volume) Basis: <br />Material weight: <br />2,100 lbsILCY <br />Struck Volume: <br />24.00 <br />LCY <br />Material description: <br />Earth - Loam <br />Heaped Volume: <br />34.00 <br />LCY <br />Rated Payload: <br />_81,600 pounds <br />Average Volume: <br />29.00 <br />LCY <br />Payload Capacity: <br />38.86 LCY <br />Adjusted Capacity: <br />29.40 <br />LCY <br />CIRCES Cost Estimeung Software <br />