My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-06-18_REVISION - C1992081 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1992081
>
2012-06-18_REVISION - C1992081 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:00:43 PM
Creation date
7/31/2012 10:59:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Revision
Doc Date
6/18/2012
Doc Name
Cost Estimate
From
DRMS
To
Hayden Gulch Terminal, LLC
Type & Sequence
SL1
Email Name
JLE
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pagel of 2 <br />SCRAPER TEAM WORK <br />Task description: Replace Topsoil from Stockpile C to TARR Stations 92 to 144 <br />Site: Hayden Gulch Loadout Permit Action: SL1 PermiUJob #: C1992081 <br />PROJECT IDENTIFICATION <br />Task #: 505 State: Colorado <br />Date: 6/18/2012 County: Routt <br />User: ME <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />Abbreviation: None <br />Filename: 0081 -505 <br />COSTShift basis: 1 per day <br />tption <br />- Scraper: Cat 637G wl ush- ull <br />- Dozer. NA <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: CAT 14M <br />-Water Truck: Water Tanker, 10,000 Gal. <br />Cn,.t 11renl:r1n►vn- Srrane.r Wnrk Trnm Cnnnnrt Fnrtinmi-nt MnintPnnnr.P Fnnimment <br />Total work team cost/hour: $1.649.70 <br />MATERIAL OUANTITIES <br />Initial volume: 41,113 CCY Swell factor: 1.000 <br />Loose volume: 41,113 LCY <br />Source of estimated volume: Seneca II -W Permit Table 21 -3 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />25 <br />25 <br />Ownership costlbour: <br />$103.90 <br />NA <br />NA <br />NA <br />$39.30 <br />$54.68 <br />Operating costlbour: <br />$232.77 <br />NA <br />NA <br />NA <br />$16.78 <br />$29.31 <br />Ripper op. costlbour. <br />NA <br />NA <br />NA <br />NA <br />$0,00 <br />$0.00 <br />Operator cost/bour: <br />$24.95 <br />NA <br />NA <br />NA <br />$24.47 <br />$38.70 <br />Unit Subtotals: <br />$361.62 <br />NA <br />NA <br />NA <br />$80.54 <br />$122.68 <br />Number of Units: <br />4 <br />0 <br />0 <br />0 <br />1 <br />I <br />Group Subtotals: <br />Work: <br />$1,446.48 <br />Support: <br />$0.00 <br />Maint: <br />$203.22 <br />Total work team cost/hour: $1.649.70 <br />MATERIAL OUANTITIES <br />Initial volume: 41,113 CCY Swell factor: 1.000 <br />Loose volume: 41,113 LCY <br />Source of estimated volume: Seneca II -W Permit Table 21 -3 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />CIRCES Cost Estimating Software <br />Scraper Bowl (volume) Basis: <br />Material weight: <br />2,100lbs{LCY <br />Struck Volume: <br />24.00 <br />LCY <br />Material description: <br />Earth - Loam <br />Heaped Volume: <br />34.00 <br />LCY <br />Rated Payload: <br />81,600 pounds <br />Average Volume: <br />29.00 <br />LCY <br />Payload Capacity: <br />38.86 LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.