My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-06-18_REVISION - C1992081 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1992081
>
2012-06-18_REVISION - C1992081 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:00:43 PM
Creation date
7/31/2012 10:59:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Revision
Doc Date
6/18/2012
Doc Name
Cost Estimate
From
DRMS
To
Hayden Gulch Terminal, LLC
Type & Sequence
SL1
Email Name
JLE
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br />SCRAPER TEAM WORK <br />Task description. Replace Topsoil from Stockpile A to TARR Stations 114 to 216 <br />Site: Hayden Gulch Loadout Permit Action: SL1 PermitlJob #: C1992081 <br />PROJECT IDENTIFICATION <br />Task #: 504 State: Colorado <br />Date: 6118!20 t 2 County: Routt <br />User: ILE <br />Agency or organization name: DBMS <br />HOURLY EQUIPMENT <br />- Scraper: <br />- Dozer: <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Cimt Rrenkr[navn a Conner WnrL- Tram <br />Abbreviation: None <br />Filename: C081 -504 <br />COSTShift basis: 1 per day <br />Cat 637G wlpush <br />NA <br />NA <br />NA <br />CAT l4M <br />Water Tanker. 10 <br />'CnnnnrF pnilinmwnf Afvin,annnra Gn„i..menr <br />Total work team cost/hour: $1,649.70 <br />MATERIAL QUANTITIES <br />Initial volume: 47,700 CCY Swell factor: 1.000 <br />Loose volume: 47,700 LCY <br />Source of estimated volume: Seneca II -W Permit Table 21 -3 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />25 <br />25 <br />Ownership cost/hour: <br />$10194 <br />NA <br />NA <br />NA <br />$39.34 <br />$54.68 <br />Operating cost/hour: <br />$232.77 <br />NA <br />NA <br />NA <br />$16.78 <br />$29.31 <br />Ripper op, cost/hour- <br />NA <br />NA <br />NA <br />NA <br />$0.40 <br />$0.00 <br />Operator cost/hour: <br />$2495 <br />NA <br />NA <br />NA <br />$24.47 <br />$38.70 <br />Unit Subtotals: <br />$361.62 <br />NA <br />NA <br />NA <br />$80.54 <br />$12 2.68 <br />Number of Units: <br />4 <br />0 <br />0 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$1,446.48 <br />Support: <br />$0.00 <br />Maint: <br />$203.22 <br />Total work team cost/hour: $1,649.70 <br />MATERIAL QUANTITIES <br />Initial volume: 47,700 CCY Swell factor: 1.000 <br />Loose volume: 47,700 LCY <br />Source of estimated volume: Seneca II -W Permit Table 21 -3 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />CIRCES Cost Estimaling Software <br />Scraper Bowl (volume) Basis: <br />Material weight: <br />2,100 lbs /LCY <br />Struck Volume: <br />24.00 <br />LCY <br />Material description: <br />Earth - Loam <br />Heaped Volume: <br />34.00 <br />LCY <br />Rated Payload: <br />81,604 pounds <br />Average Volume: <br />29.00 <br />LCY <br />Payload Capacity: <br />38.86 LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />CIRCES Cost Estimaling Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.