My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-06-18_REVISION - C1992081 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1992081
>
2012-06-18_REVISION - C1992081 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:00:43 PM
Creation date
7/31/2012 10:59:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Revision
Doc Date
6/18/2012
Doc Name
Cost Estimate
From
DRMS
To
Hayden Gulch Terminal, LLC
Type & Sequence
SL1
Email Name
JLE
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br />EQUIPMENT MOBILIZATION /DEMOBILIZATION <br />Task description: Mob /Demnh equip. for Reclamation of Loodout Area and TAHR <br />Site: _Hayden Gulch Londout Permit Action: SL1 Permitl7ob#it: 01992081 <br />PROJECT IDENTIFICATION <br />Task #: 045 State: Colorado <br />Date: 6/18/2012 County: Routt <br />User: JLE <br />Agency or organization name: DRMS <br />EQUIPMENT TRANSPORT RIG COST <br />Abbreviation: None <br />Filename: 0081 -045 <br />Shift basis: der day <br />Cost Data Source: CRG Data <br />Truck Tractor Description: GENERIC ON- HIGHWAY TRUCK TRACTOR, 6X4, DIESEL POWERED, <br />400 HP {2ND HALF, 2006} <br />Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT TRAILER <br />(25T, 50T, AND 100T) <br />Cost Breakdown: <br />Available Rig Capacities <br />0 -25 Tons <br />26-50 Tons <br />51+ Tons <br />Ownership Cost/Hour. <br />$16.63 <br />$18.37 <br />$22.33 <br />D eratin 0ost/Hour: <br />$44.38 <br />$46.13 <br />$50.07 <br />Operator Cost/Hour. <br />$27.66 <br />$27.66 <br />$27.66 <br />Helper Cost/Hour: <br />$0.00 <br />$25.39 <br />$25.39 <br />Total Unit Cost/Hour: <br />1 $88.67 <br />1 $117.55 <br />$125.45 <br />NON ROADABLE EQUIPMENT: <br />Machine <br />Weight/ <br />Owner ship <br />Haul Rig <br />FIeet <br />Haul Trip <br />Return Trip <br />DOT Permit <br />Description <br />Unit <br />Cost/hr/ unit <br />Cost/hr /unit <br />Size <br />Cost/hr/ <br />Cost/hr/ fleet <br />Cost/ fleet <br />$81.14 <br />(TONS) <br />$162.28 <br />$16228 <br />Water Tanker, 10,000 Gal. <br />fleet <br />1 l <br />1 $171.92 <br />Cat 010T -10SU <br />84.53 <br />$102.22 <br />$125.45 <br />2 <br />$455.33 <br />$250.90 <br />$50moo <br />CAT 14M <br />2157 <br />$42.77 <br />$88.67 <br />1 <br />$131.44 <br />$88,67 <br />$250,00 <br />Cat 637G w/push- <br />59.59 <br />$103.90 <br />$125.45 <br />4 <br />$917.40 <br />$501.80 <br />$500'00 <br />pull <br />Drill /Broadcast <br />25.00 <br />$39.59 <br />$88.67 <br />1 <br />$128.26 <br />$88.67 <br />$2%00 <br />Seeder with Tractor <br />Power Mulcher <br />6.00 <br />$7.03 <br />$88.67 <br />1 <br />$95.70 <br />$88.67 <br />$250.00 <br />Rcinco M90 <br />Subtotals: L $1,728.13 1 51018.71 $1,750.00 <br />ROADABLE EQUIPMENT: <br />Machine Description <br />Total Cost/hr/ unit <br />Fleet Size <br />Haul Trip <br />Cost/hr/ fleet <br />Return Trip <br />Cost/hrl fleet <br />Flatbed Truck, 6A. 45K GVW <br />$55.51 <br />1 <br />$55.51 <br />$55.51 <br />Fuel Tanker, 4x2, 170 HP <br />$32,69 <br />1 <br />$32.69 <br />$32.69 <br />Generic 8 -10 c , 6x4 <br />$81.14 <br />2 <br />$162.28 <br />$16228 <br />Water Tanker, 10,000 Gal. <br />$171.92 <br />1 l <br />1 $171.92 <br />1 $171.92 <br />Subtotals: I $422.40 1 $422.40 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.