Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 021 Page 2 of 2 <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type. <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(FND -RF) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.868 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.3890 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />668.65 LCYIhr <br />668.65 LCYfhr <br />FIeet size: I Dozer(s) <br />Unit cost: $0.497fLCY <br />Total job time: <br />Total job cost: <br />6.73 Hours <br />$2,234.96 <br />CIRCES Cast Estimating Sotlware <br />