Laserfiche WebLink
COST SUMMARY WORK <br />Task description: Reclamation Cost Estimate SL1 <br />Site: Hayden Gulch Loadout <br />PROJECT IDENTIFICATION <br />Task #: AO I <br />Date: 6/18j2012 <br />User: JLE <br />Permit Action: SL1 <br />State: Colorado <br />County: Routt <br />Agency or organization name: DRMS <br />TASK LIST DIRECT COSTS <br />Permit/Job #: C1992081 <br />Abbreviation: None <br />Filename: C081 -A01 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cast <br />001 <br />002 <br />003 <br />006 <br />007 <br />011 <br />015 <br />018 <br />019 <br />020 <br />021 <br />024 <br />025 <br />028 <br />031 <br />032 <br />033 <br />034 <br />037 <br />040 <br />041 <br />045 <br />046 <br />047 <br />501 <br />502 <br />503 <br />504 <br />505 <br />506 <br />507 <br />Reg de Rail Loop <br />DOZER <br />2 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />2 <br />1 <br />2 <br />2 <br />2 <br />2 <br />79.85 <br />$54,365.05 <br />$36,483.22 <br />$1,971.29 <br />$693.00 <br />$905.00 <br />$2,157.06 <br />$7,609.00 <br />$558.74 <br />$1,891.62 <br />$5,587.41 <br />$2,234.96 <br />$88,763.87 <br />$17,986.20 <br />$132.84 <br />$53,387.51 <br />$2,070.52 <br />$45,05736 <br />$2,746,78 <br />$181,037.98 <br />$3,588.02 <br />$10,795.20 <br />$9,491.65 <br />$3,578.11 <br />$5,710.47 <br />$38,297.00 <br />$172,49057 <br />$9,167.00 <br />$55,577.14 <br />$45,789.03 <br />$15,900.95 <br />$25,700.35 <br />Regrade Rail Spur <br />DOZER <br />54.93 <br />Regrade Facilities Area; Office/Parking Lot <br />DOZER <br />594 <br />Rip Facilities Area <br />RIPPER <br />2.03 <br />Rip Haul Road HGLF -HR1 <br />RIPPER <br />2.65 <br />Regrade Haul Road HGLF -HRI <br />DOZER <br />6.34 <br />Finish Grade Disturbed Area <br />GRADER <br />56.63 <br />Regrade Truck Loop Pond <br />DOZER <br />1.68 <br />Regrade Rail Loop Pond <br />DOZER <br />5.70 <br />Regrade All Ditches <br />DOZER <br />8.41 <br />Regrade Leach Field <br />DOZER <br />6.73 <br />Replace Topsoil on Rail Loop and Facilities Area <br />SCRAPERI <br />122.73 <br />Replace Topsoil on Rail Spur <br />SCRAPERI <br />24.87 <br />Scal Alluvial Wells HGDAL3 and <br />BOREHOLE <br />0.00 <br />Drill Seed Mix #I <br />REVEGE <br />57.20 <br />Drill Seed Mix #2 <br />REVEGE <br />2.40 <br />Drill Seed Mix #3 <br />REVEGE <br />42.90 <br />H droseed Mix #3 <br />REVEGE <br />2.00 <br />Demolish and Remove Structures <br />DEMOLISH <br />0.00 <br />Clean Sediment from Ponds Once During Liability <br />Period <br />TRUCKI <br />7.01 <br />Site Maintenance Over the Ten -Year Liability <br />Period $52,676 <br />SITEMAINT <br />ENANCE <br />80.00 <br />MoblDemob equip. for Reclamation of Loadout <br />Area and TAHR <br />MOBILIZE <br />3.60 <br />Mob /Demobilization for Pond Removal <br />MOBILIZE <br />3.60 <br />Mob /Demobilization for Maintenence and Pond <br />Cleaning <br />MOBILIZE <br />3.60 <br />_Rip TAHR <br />RIPPER <br />55.40 <br />Remove TAHR Surface Material to Pit <br />SCRAPERI <br />104.56 <br />Grade TAHR to Blend <br />GRADER <br />66.6I <br />Replace Topsoil from Stockpile A to TA14R <br />Stations 114 to 216 <br />SCRAPERI <br />33.69 <br />Replace Topsoil from Stockpile C to TAHR <br />Stations 92 to 144 <br />SCRAPERI <br />27.76 <br />Replace Topsoil from Stockpile D to TAHR <br />Stations 76 to 92 <br />SCRAPERI <br />9.64 <br />Replace Topsoil from Stockpile E to TAHR <br />Stations 40 to 76 <br />SCRAPERI <br />15.58 <br />