My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-07-17_REVISION - C1981020
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981020
>
2012-07-17_REVISION - C1981020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:03:36 PM
Creation date
7/31/2012 10:42:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981020
IBM Index Class Name
Revision
Doc Date
7/17/2012
Doc Name
Cost Estimate
From
Brock Bowles
To
Mike Boulay
Type & Sequence
RN6
Email Name
BFB
MPB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck/Loader Worksheet Cont’dTask # 005Page 2of 3 <br />Truck Bed(volume) Basis: <br />Struck Volume:8.00LCY <br />Heaped Volume:10.00LCY <br />Average Volume:9.00LCY <br />Adjusted Volume:9.41LCY <br />Final Truck Volume Based on Number of Loader Passes:8.74LCY <br />Loading Tool Capacity <br />Bucket Size Class:Large <br />Rated Capacity:3.330LCY(heaped) <br />Bucket Fill Factor:0.875Loose material -1” and over (85 -90%) 0.875 <br />Adjusted Capacity:2.914LCY <br />Job Condition Corrections: <br />Site Altitude (ft.): 5600feet <br />TruckLoaderSource <br />Altitude Adj:1.0001.000(CAT HB) <br />Job Efficiency:0.8300.830(CAT HB) <br />Net Correction:0.8300.830 <br />Loading Tool Cycle Time: <br />Number of Loading Tool Passes Required to Fill Truck:3passes <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating:AVERAGE <br />Selected Value within this Basic Rating:AVERAGE <br />Track Loaders –Material Description: <br />Cycle Time Elements (min.): <br />Load:NAManeuver:NADump:0.100 <br />Wheel and Track Loaders -Unadjusted Basic Loader Cycle Time (load, dump, maneuver):NAminutes <br />Cycle Time FactorsFactor (min.)Source <br />Material:NANA(Cat HB) <br />Stockpile:NANA(Cat HB) <br />Truck Ownership:NANA(Cat HB) <br />Operation:NANA(Cat HB) <br />Dump Target:NANA(Cat HB) <br />Net Cycle Time Adjustment:NAminutes <br />Adjusted Loader Cycle Time:0.321minutes <br />Net Load Time per Truck:0.742minutes <br />Truck CycleTime: <br />Truck Exchange Time:0.50MinutesAdjusted for site altitude:0.500Minutes <br />Truck Load Time:0.742MinutesAdjusted for site altitude:0.742Minutes <br />Truck Maneuver and Dump Time:0.80MinutesAdjusted for site altitude:0.800Minutes <br />Truck Travel (Haul & Return) Time: Road Condition: Firm, smooth, rolling, dirt/lt. surfaced, watered, <br />maintained 3.0 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.