Laserfiche WebLink
Bulldozer Worksheet Cont’dTask # 002Page 2of 2 <br />Visibility:1.000(AVG.) <br />Job efficiency:0.830(1 SHIFT/DAY) <br />Spoil pile:0.800(SSD-AC) <br />Push gradient:0.666(CAT HB) <br />Altitude:1.000(CAT HB) <br />Material Weight:0.793(CAT HB) <br />Blade type:1.000(PAT) <br />Net correction:0.2367 <br />Adjusted unit production:201.81LCY/hr <br />201.81 <br />Adjusted fleet production:LCY/hr <br />JOB TIME AND COST <br />Fleet size:1Dozer(s) <br />Unit cost:$0.990/LCY <br />Total job time:38.65Hours <br />Total job cost:$7,724.53 <br />CIRCES Cost Estimating Software <br />