Laserfiche WebLink
Mobilization Worksheet Cont’dTask # 042Page 2of 2 <br />EQUIPMENT HAULDISTANCE and Time <br />Nearest Major City or Town within project area region:GRAND JUNCTION <br />Total one-way travel distance:40.00miles <br />Average Travel Speed:40.00mph <br />Total Non-Roadable Mob/Demob Cost * <br />$5,134.22 <br />‘* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />$617.58 <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Non-Roadable <br />Roadable <br />Equipment <br />Equipment <br />Haul Time (Hours):1.001.00 <br />Return Time (Hours):1.001.00 <br />Loading Time (Hours):0.50NA <br />Unloading Time(Hours):0.50NA <br />Subtotals:3.002.00 <br />JOB TIME AND COST <br />Total job time:6.00Hours <br />Total job cost:$5,751.80 <br />CIRCES Cost Estimating Software <br />