Laserfiche WebLink
Page 1of 3 <br />TRUCK/LOADERTEAMWORK <br />Task description:Replace Topsoil From Stockpile to Refuse Pile <br />Site:Munger Canyon MinePermit Action:RN-6Permit/Job#:C1981020 <br />PROJECT IDENTIFICATION <br />Task #:034State:ColoradoAbbreviation:None <br />Date:7/17/2012County:GarfieldFilename:C020-034 <br />User:BFB <br />Agency or organization name:DRMS <br />HOURLY EQUIPMENT COST <br />Shift basis: 1 per day <br />Equipment Description <br />Truck LoaderTeam -Truck:Generic 8-10 cy, 6x4 <br />-Loader:Cat 336D L 10’-6” Stick <br />Support Equipment -Load Area:NA <br />-Dump Area:NA <br />Road Maintenance –Motor Grader:NA <br />-Water Truck:NA <br />Cost Breakdown: <br />Truck/LoaderTeamSupport EquipmentMaintenanceEquipment <br />TruckExcavatorLoad AreaDump AreaMotor GraderWater Truck <br />%Utilization-machine:10095NANANANA <br />Ownership cost/hour: $9.13$42.44NANANANA <br />Operating cost/hour:$49.72$73.94NANANANA <br />Ripper op. cost/hour:NA$0.00NANANANA <br />Operator cost/hour:$0.00$38.67NANANANA <br />Unit Subtotals:$58.85$155.06NANANANA <br />Number of Units:410000 <br />Group Subtotals:Work:$390.46Support:$0.00Maint:$0.00 <br />$390.46 <br />Total work team cost/hour: <br />MATERIAL QUANTITIES <br />Initial volume:1,390CCYSwell factor:1.125 <br />Loose volume:1,564LCY <br />Source ofestimated volume:Opertor Estimate, Technical Revision 22 <br />Source of estimated swell factor:Cat Handbook <br />Material Purchase Cost:$0.00 <br />Total Cost:$0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight:2,550Pounds/LCY <br />Description:Earth -Dry packed <br />Rated Payload:27,280Pounds <br />Payload Capacity:10.70LCY <br />CIRCES Cost Estimating Software <br />