Laserfiche WebLink
top soil to use for tasks not yet completed such as reclaiming Pond No. 5. Therefore, any needed top soil <br /> would have to be purchased and trucked in from a much longer distance at a much higher cost. Task 053 <br /> estimates cost for plugging and reclaiming only 6 drill holes, but as part of the problems noted above <br /> there are 18 drill holes unaccounted for. However, the largest probable cost could be repair of Newlin <br /> Creek, which cost could be many times the total bond now posted. We would request notification of <br /> future bond determinations pursuant to 3.02.2(4)(b). <br /> Signed: <br /> WD Corley, Jr. <br /> Pres., The Corley Company <br /> July 30, 2012 <br />