Laserfiche WebLink
6.4.12 Exhibit L <br />Reclamation Costs <br />Reclamation cost estimate was calculated on a per acre basis and applied to <br />potentially impacted acreage of 30 acres. As stated in the Reclamation Plan, <br />reclamation will occur concurrently with mining not only to minimize affected area at <br />any one time but also to reduce the need for overburden and topsoil stockpiles. <br />Direct Tasks Unit <br />Quantity <br />Cost <br />Total Cost <br />Placing topsoil and <br />fines <br />Bull dozer hours <br />0.5 <br />$ 145.00 <br />$ <br />72.50 <br />Loader hours <br />0.5 <br />$ 145.00 <br />$ <br />72.50 <br />Subtotal <br />$ <br />145.00 <br />Seeding <br />Broadcasting hours <br />0.5 <br />$ 300.00 <br />$ <br />150.00 <br />Seed mix acre <br />1 <br />$ 350.00 <br />$ <br />350.00 <br />Mulch acre <br />1 <br />$ 187.50 <br />$ <br />187.50 <br />Subtotal <br />$ <br />687.50 <br />Tracking seed and <br />mulch <br />Dozer hours <br />0.5 <br />$ 154.00 <br />$ <br />77.00 <br />Subtotal <br />$ <br />1,742.00 <br />Affected Area <br />Reclaimed acre <br />30 <br />$ <br />52,260.00 <br />Mobilization fee hours <br />1.5 <br />$ 100.00 <br />$ <br />150.00 <br />Direct Expenses <br />Total <br />$ <br />52,410.00 <br />Indirect Tasks <br />Liability insurance <br />0.0155 <br />$ <br />812.36 <br />Performance bond <br />0.015 <br />$ <br />786.15 <br />Profit <br />0.1 <br />$ <br />5,241.00 <br />Job Superintendent <br />20 <br />$ 88.00 <br />$ <br />1,760.00 <br />Subtotal <br />$ <br />8,599.51 <br />Miscellaneous indirect <br />0.0925 <br />$ <br />5,643.38 <br />Total Bond <br />$ 66,652.88 <br />12 <br />