My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-07-20_REVISION - M2004009 (9)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2004009
>
2012-07-20_REVISION - M2004009 (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:12:00 PM
Creation date
7/23/2012 3:45:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004009
IBM Index Class Name
REVISION
Doc Date
7/20/2012
Doc Name
NEW AMENDMENT
From
WSI WEILAND
To
DRMS
Type & Sequence
AM2
Email Name
ECS
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT L - RECLAMATION COSTS <br />DIRECT COSTS <br />Item Task Description Unit Unit Cost # of Units Cost <br />1 Grade 630,000 yd of shale over or onto Cell 2 yd $0.85 630,000 $535,500.00 <br />2 Topsoil Replacement 197 acres @ 0.5' Depth yd $0.58 158,914 $92,170.12 <br />3 Dewatering Pit 150 acre -ft acre -ft $65.67 150 $9,850.50 <br />4 Revegetate Disturbed Area acre $550.00 197 $108,350.00 <br />5 Mobilization /Demobilization move $2,000.00 1 $2,000.00 <br />6 Construct PVC hydraulic barrier yd $0.80 3,000 $2,400.00 <br />7 Remove Low Water Crossing Area and Restore Area hr $119.38 20 $2,387.60 <br />WATER RIGHT PIPELINE (3CFS) <br />9 Install 363 If of 18" cmp ft $31.48 363 $11,427.24 <br />10 Construct 9'x0.5'x2.5' wingwall yd $350.00 11 $3,937.50 <br />11 Construct Type L Rip Rap Outlet Protection (18" depth) yd $18.00 63 $1,130.40 <br />Total Direct Costs $769,153.36 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT <br />1 Liability Insurance (2.02% of Direct Costs) <br />2 Performance Bond (1.05% of Direct Costs) <br />3 Job Superintendent Costs <br />4 Profit @10% of Direct Costs <br />Total Overhead and Profit <br />Contract Amount (Direct Costs plus Overhead and Profit) <br />hr <br />1 Engineering work and /or contract/bid preparation @4.25% of contract <br />2 Reclamation management and /or administration @5.00% of contract <br />$15,536.90 <br />$8,076.11 <br />$39.38 386.5 $15,220.37 <br />$76,915.34 <br />$115,748.71 <br />$884,902.07 <br />$37,608.34 <br />$44,245.10 <br />TOTAL BOND AMOUNT $966,755.52 <br />EXHIBIT L 7/18/2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.